| Prameter/Type | XJ-65 | XJ-115B | XJ-120 | XJ-150 | XJ-200 | XJ-250 |
| Forms of Screw and Screw Thread | Double-head equal-depth convergent type | Double-head convergent type | Double-head convergent type | Double-head unequal-depth convergent type | Double-head convergent type | Double-head convergent type |
| Screw Diameter (mm) | 65 | 115 | 120 | 150 | 200 | 250 |
| Length-diameter Ratio of Screw(L/D) | 4 | 4.8 | 4.6 | 4.43 | 4.35 | 4.5 |
| Compression Ratio |
| 1.3 |
| 1.34 |
|
|
| Rotary Speed of Screw r/min | 5.2~52 | 5.4~54 | 5.6~55.6 | 20~26 | 22.4~67.2 | 19.7~59.1 |
| Motor Power (KW) | Electromagnetic speed 7.5KW | Electromagnetic speed 22KW | Electromagnetic speed 22KW | Frequency control 55KW/ Motor commutator 8.3-55KW | 25-75Motor commutator | Motor commutator 33.3-100 |
| Production Capacity (kg/h) | 50~80 | 100-420 | 100~450 | 700-1200 | 1500-2200 | 2000-3200 |
| Stream Pressure (Mpa) | 0.2-0.3 | 0.4-0.6 | 0.2~0.4 | 0.6 | 0.6-0.8 | 0.6-0.8 |
| Cooling Water Pressure (Mpa) | 0.2-0.3 | 0.2-0.3 | 0.2~0.4 | 0.2-0.3 | 0.2-0.3 | 0.2-0.3 |
| Size (L×W×H)(mm) | 1750×550×1100 | 2390×760×1450 | 2427×750×1330 | 3411×814×1470 | 4564×1800×1750 | 4950×1150×1483 |
Equipment painting completed before delivery, and then wrapped with
stretch film, avoid rubbing the paint off the surface, wooden
packaging can be customized, key parts, such as electronic control
box, will be wrapped by shockproof packaging materials, and then
packed in wooden cases.
1. Delivery time of the rubber machines?
This is specially designed machine according to your specific
requirement.From engineer designing to production completion, it
needs about 25 to 35 days.
2. What does your factory do regarding quality control?
We pay much more importance to quality control from the very
beginning to the end of production.Every machine will be fully
assembled and carefully tested before shipment.
3. What's the machine quality guarantee?
Quality guarantee time is one year.We choose world famous brand
components to keep our machine in perfect working condition.
4. Are you able to give installation and commissioning overseas?
How long time will it take?
Yes, we can supply overseas service and technical support but
customer needs to pay for the cost of the installation.Small
machine usually takes within 2~3 days.Big plant usually takes about
30 days.
5. How can I trust you to deliver the right machine as I ordered?
We will absolutely deliver a good quality machine as we discussed
and confirmed in the order.
The core of our company culture is innovation, quality, integrity
and efficiency. Also we have had much good cooperation with world
famous rubber production manufacturers. If you come to our factory,
we can show you're the user around us.
6. How can we go to your side?
We are located in Qingdao City, Shandong province, China. The name
of airport is Qingdao Jiaodong airport.We will pick up you at the airport.
Contact:
W/A: +8618344700139
Mail: rubbermachine@sfcjx.com