China Environmental Test Chambers manufacturer
BOTO GROUP LTD
BOTO MACHINE TODAY'S QUALITY IS THE MARKET FOR TOMORROW
5
Home > Products > Environmental Test Chambers >

Advanced Temperature Control For Precise Testing In Environmental Test Chambers

Advanced Temperature Control For Precise Testing In Environmental Test Chambers

Brand Name BOTO
Model Number BT-ZT-4018
Certification CE ISO
Place of Origin China
Minimum Order Quantity 1set
Payment Terms L/C, T/T
Supply Ability 80 Set/Sets per Month
Delivery Time 5-25 days
Packaging Details wooden case
Chamber size 400 × 400 × 500mm (depth × width × height)
Temperature range -60 ℃ ~ + 150 ℃
Temperature rising and falling rate linear 5 degrees between -40 ~ 70 ° (5 degrees per minute)
Temperature uniformity ≤ ± 2 ℃
Temperature deviation ≤ ± 2 ℃
Inside material SUS304 stainless steel
Wind speed 1.7 ~ 2.5m / s (The above indicators are measured under ambient temperature ≤25 ℃, normal pressure, no load, no load, and 1/6 space from the inner wall of the cabinet
Power about 20Kw
Power supply 380V ± 10% V; 50Hz
Detailed Product Description

 

Programmable Rapid Temperature Change Test Chamber

Product Description

Overview:

The test box is to provide high and low temperature constant, high and low temperature test environment; including refrigeration system, heating system, air duct system, control system, system safety protection device, etc.

 

Technical parameter:

Chamber size

400 × 400 × 500mm (depth × width × height)

Temperature range

-60 ℃ ~ + 150 ℃

Temperature rising and falling rate

linear 5 degrees between -40 ~ 70 ° (5 degrees per minute)

Temperature uniformity

≤ ± 2 ℃

Temperature deviation

≤ ± 2 ℃

Inside material

SUS304 stainless steel

 

Wind speed

1.7 ~ 2.5m / s (The above indicators are measured under ambient temperature ≤25 ℃, normal pressure, no load, no load, and 1/6 space from the inner wall of the cabinet

Power

about 20Kw

Power supply

380V ± 10% V; 50Hz

 

Standard:

GB / T2423.22-87Nb GJB1032-90 MIL-STD-2164 / (E / C)

GB / T2423.4-93 GB / T2423.34-86 GJB150.9-86

 

Test box structure:

Integral structure, that is, test box, refrigeration system, heating system, air conditioning system, electrical control cabinet, and refrigeration unit are integrated. The refrigeration unit is located at the bottom of the cabinet, and the electrical control part is placed on the side of the test box for easy operation.

1. Cabinet:

a) In the air duct inter layer at one end of the working room, there are heating / humidifier, refrigeration evaporator, blower motor, fan blade and other devices;

b) There is one cable threading hole on the side of the test box, the size is Φ50mm;

c) The test chamber studio is made of 1mm thick SUS304 stainless steel plate, and the cabinet shell is made of 1mm thick high-quality stainless steel

d) The insulation material is made of polyurethane foam, with a thickness of 100mm, good insulation effect, and no frost or condensation on the outer surface of the test chamber.

e) The studio is equipped with two layers of adjustable stainless steel strip shelves;

f) The box body is equipped with condensate drain.

2. Cabinet Door:

For single-open doors, double-line silicone rubber sealing strips are used for door sealing;

3. Observation and lighting device:

A multi-layer hollow glass observation window is installed on the door, the size is about 300 × 275mm, and a heating anti-frost device is provided. A 20W halogen lamp (AC12V) is installed on the door of the test chamber.

 

Packaging & Shipping

 

Honor and certification

 

Cooperative partners

 

 

Product Tags: Advanced Temperature Control Environmental Test Chambers   Precise Testing Environmental Test Chambers   Precise Advanced environmental chamber  
Related Products
Email to this supplier
 
From:
Enter your Email please.
To: BOTO GROUP LTD
Subject:
Message:
Characters Remaining: (80/3000)