China Temperature Test Chambers manufacturer
Guangdong ALI Testing Equipment Co,.Ltd
Guangdong ALI Testing Equipment Co,.Ltd's brand GSKA passed and strictly implemented the ISO9001:2008 quality management system, ISO14001-2004 environmental system certification, European CE
4
Home > Products > Thermal Shock Chamber >

Multifunctional Environmental Thermal Shock Test Machine Customizable

Multifunctional Environmental Thermal Shock Test Machine Customizable

Brand Name GSKA
Model Number Thermal Shock Chamber
Certification CE SGS ROHS UL CE
Place of Origin Dongguan China
Minimum Order Quantity Negotiate
Price Negotiate
Payment Terms T/T, L/C
Supply Ability 100 Set / Sets per Month
Delivery Time 10-60days after confirmed payment or by contract stipulation
Packaging Details Export package
Application Electrics
Impact Recovery time (-40)℃~(+150)℃≤5min
Temperature fluctuation ±1.0℃
Temperature uniformity ±2.0℃
Customized support OEM
Power 220V , 50Hz
Condenser Water-cooled condensing agent
keyword Thermal Shock Chamber
Detailed Product Description

Multifunctional Environmental Thermal Shock Test Machine Customizable

 

Mechanical sheet metal structure:

 

All functions are controlled by computer, it is self-developed software, and has a good operation interface, which makes the user's operation and monitoring more simple and intuitive. You can set the time and parameters on the screen to switch between cooling, heating, and blue transfer, and press the set button. The setting is performed automatically.


The cold box and the hot box are independently controlled, and the box doors are independent of each other, which expands the use range of the test box (one box for three purposes).


The thermal insulation effect of the product can be fully guaranteed.


The door of the test chamber is interlocked with the circulating fan and the blue drive to protect the safety of the operator. Once the door is opened, the power supply of the circulating fan and the blue drive will be automatically cut off.


There is a standard lead hole tube on the top of the box, which is convenient for users to introduce sensor lines, detection cables and other types of leads into the box.

 

Product Features :

 

1. The product is beautiful in appearance, reasonable in structure, advanced in technology and exquisite in material selection, with simple and convenient operation performance and reliable equipment performance. The equipment is divided into three parts: high temperature box, low temperature box and test box. It adopts a unique thermal insulation structure and heat storage and cold storage effect. During the test, the object to be tested is completely still, and the cold and hot air are switched to the test area. To achieve the purpose of thermal shock test.


2. The most advanced measuring device is adopted, and the controller adopts a large-scale color LCD human-machine touch interactive LCD human-machine interface controller, which is easy to operate, easy to learn, stable and reliable, and displays the complete system operating status, execution in Chinese and English. and set the program curve.


3. With 96 test specifications independently set, the impact time is 999 hours and 59 minutes, and the cycle period can be set from 1 to 999 times. Time to start and stop work automatically;


4. There is a test hole with a diameter of 50mm on the left side of the box, which can be used for external power load wiring test components.


5. The function of three different conditions of high temperature, low temperature and hot and cold shock can be independently set, and when the cold and hot shock conditions are executed, the two-slot or three-slot type and the function of cold punching and hot punching can be selected. The function of high and low temperature testing machine.


6. Equipped with fully automatic, high-precision system loop, any mechanical action, fully P.L.C locking processing, all using P.I.D automatic calculation control, high temperature control accuracy.

 

 

Temperature rangeA.high-temperature : +60 degree to +150 degree
B.low-temperature : -10 degree to -40 degree
Control temperature±2 degree
resolution0.01 degree
Heating time at high-temperature regionFrom RT to 150 about 35min (RT is from 5 degree to 30 degree).
Cooling time at low-temperature regionFrom RT to -40 degree about 50min (RT is from 5 degree to 30 degree)
Moving time and temperature recover timeA. testing bastet moving from high-temperature to low-temperature spend 10sec
B.after exchanging the temperature,the tempreature recovery time: 3min to 5min (Stabilization time ≥ 30min)
Device noiseBelow 75dB.
Weight10Kg
Testing region(hot and cold)50cm(W)*50cm(H)*50cm(D)
Outside size140cm(W)*180cm(H)*142cm(D)
Testing basket size30cm(W)*40cm(H)*30cm(D)
Inside materialSUS#304 Cold-Heat-resistant stainless steel
Outside materialSUS#304 Cold-Heat-resistant stainless steel
Insolution materialHigh-density glass wool and high strength PU foam insulation
Anti-sweat structureinsulation layer and door micro-thermal anti-sweat
ExpansionHeat reach 300 degree, cold reach -100 degree




Service:


1. Device installation;


2. Equipment Operation Test Technology training;


3. Equipment Calibration;


4. Daily maintenance and maintenance of equipment


5 Free technical training for visiting factories


6 24-hour Online contact


7 Free software upgrades

Product Tags: ODM Thermal Shock Chamber   10Kg Thermal Shock Chamber   Multifunctional Thermal Environmental Chamber  
Related Products
Email to this supplier
 
From:
Enter your Email please.
To: Guangdong ALI Testing Equipment Co,.Ltd
Subject:
Message:
Characters Remaining: (80/3000)