High Precision Three-Box Cold And Thermal Shock Test Chamber 220v
50hz
The three-box cold and thermal shock test chamber is designed and
manufactured according to user requirements. It is suitable for
high and low temperature impact test of complete machines and parts
of aviation, aerospace, military, naval, electrical, electronic and
other products and storage in high temperature or low temperature
environment. and test. It is for users to carry out corresponding
climatic and environmental accelerated tests on the whole machine
(or components), electrical appliances, instruments, materials,
coatings, coatings, etc., so as to evaluate the test sample or the
test behavior of the test sample.
Equipment summary:
Hot and cold impact testing machines used to test the change of
material under extremely high temperature and extremely low
temperature environment that continue alternation in the shortest
time, Testing the chemical changes or physical damage of material
caused by the thermal expansion and contraction. Testing box
divided two parts, one is high-temperature region, another is
low-temperature region, the testing sample placed on the moving
basket, using unique heat storage and cool storage, the cylinder
taking basket moves up and down in the hot and cold region to
complete the hot and cold temperature impact testing; applied to
test the material, including metal, plastic, rubber,
electronics.... and other materials, it can be used as a basis for
improvement of their products.
Temperature range | A.high-temperature : +60 degree to +150 degree |
B.low-temperature : -10 degree to -40 degree |
Control temperature | ±2 degree |
resolution | 0.01 degree |
Heating time at high-temperature region | From RT to 150 about 35min (RT is from 5 degree to 30 degree). |
Cooling time at low-temperature region | From RT to -40 degree about 50min (RT is from 5 degree to 30
degree) |
Moving time and temperature recover time | A. testing bastet moving from high-temperature to low-temperature
spend 10sec |
B.after exchanging the temperature,the tempreature recovery time:
3min to 5min (Stabilization time ≥ 30min) |
Device noise | Below 75dB. |
Weight | 10Kg |
Testing region(hot and cold) | 50cm(W)*50cm(H)*50cm(D) |
Outside size | 140cm(W)*180cm(H)*142cm(D) |
Testing basket size | 30cm(W)*40cm(H)*30cm(D) |
Inside material | SUS#304 Cold-Heat-resistant stainless steel |
Outside material | SUS#304 Cold-Heat-resistant stainless steel |
Insolution material | High-density glass wool and high strength PU foam insulation |
Anti-sweat structure | insulation layer and door micro-thermal anti-sweat |
Expansion | Heat reach 300 degree,cold reach -100 degree |
Types of Humidity Systems:
There are various types of humidity systems used on test chambers
today such as a water bath, boiler/steam
generator and atomizing system.
Water Pan - Very stable, but slow response
Boiler - Standard on most CSZ chambers. The advantages of this
system are that it can attain 98%
humidity and has large capacity to work in any size unit. The
disadvantages of this system is that live
load from boiler can cause problems at lower temperatures when the
DUT generates heat.
Atomizer - This system sprays very fine drops of water into the
air stream. The advantages of this system
are that it provides good control with live loads. CSZ typically
uses this type of humidity systems for
devices under test that are over 500 watts, with the exception of
larger chambers.
Application :
Temperature adaptability test under the condition of rapid change,
or gradient for electrical, electronic, instruments and other
products or spare parts, particularly applies to environmental
stress screening test (ESS)
Environmental stress screening (ESS) refers to the process of
exposing a newly manufactured or repaired product or component
(typically electronic) to stresses such as thermal cycling and
vibration in order to force latent defects to manifest themselves
by permanent or catastrophic failure during the screening process.
The surviving population, upon completion of screening, can be
assumed to have a higher reliability than a similar unscreened
population.
ESS can be performed as part of the manufacturing process or it can
be used in new product qualification testing.
We keep good quality and competitive price to ensure our customers
benefit ; We respect every customer as our friend and we sincerely
do business and make friends with them,no matter where they come
from. Each batch of parts is done quality sampling inspection
before into the warehouse, and Each product before delivery is
tested by the national authoritative third-party inspection agency
Service:
1. Device installation;
2. Equipment Operation Test Technology training;
3. Equipment Calibration;
4. Daily maintenance and maintenance of equipment
5 Free technical training for visiting factories
6 24-hour Online contact
7 Free software upgrades