China Temperature Test Chambers manufacturer
Guangdong ALI Testing Equipment Co,.Ltd
Guangdong ALI Testing Equipment Co,.Ltd's brand GSKA passed and strictly implemented the ISO9001:2008 quality management system, ISO14001-2004 environmental system certification, European CE
4
Home > Products > Climatic Test Chamber >

OEM Temperature Climatic Test Chamber Antirust With TH900C Controller

OEM Temperature Climatic Test Chamber Antirust With TH900C Controller

Brand Name GSKA
Model Number Climatic Test Chamber
Certification CE SGS ROHS UL CE
Place of Origin Dongguan China
Minimum Order Quantity Negotiate
Price Negotiate
Payment Terms T/T, L/C
Supply Ability 100 Set / Sets per Month
Delivery Time 10-60days after confirmed payment or by contract stipulation
Packaging Details Export package
Shock Temperature -50°C~150°C
Controller Programmable LCD Touch Screen
Temperature fluctuation ±1.0℃
Temperature uniformity ±2.0℃
Customized support OEM
Power 220V , 50Hz
Condenser Water-cooled condensing agent
Controller resolution ±0.3℃;±2.5%RH
Detailed Product Description

Programmable LCD Touch Screen Climatic Test Chamber Shock Temperature: -50°C~150°C​
 

All units and assemblies are selected of high quality.

 

After assembly, the test chamber is tested in a continuous cycle for two weeks to control the maintenance of the most difficult conditions.

 

It is intended for research and quality control of various materials, products, components, assemblies, structures, mechanisms, measuring instruments, etc. associated with temperature exposure at low temperatures down to -30 ° С and positive up to + 100 ° С and humidity from 10% to 98% at certain temperatures (on request). 
 
It is used to simulate special operating conditions in laboratories of radio-electronic, mechanical engineering, food, chemical, pharmaceutical, etc. industries.
 
The operating temperature range in the chamber from -30 ° C to + 100 ° C is maintained throughout the volume.
The range of humidity maintenance is from 10% to 98%, at temperatures from + 10 ° С to + 85 ° С. 

 

 

Shock Temperature ragne-65°C~150°C
Heating up timeRT~200°C about 35min
Cooling down timeRT~-70°C about 90min

Temp recover time/

change time

≤5min / ≤10sec
Temp control accuracy/±0.5°C / ±2.0°C
distribution accuracy
Inner materialsSUS 304# stainless steel plate for inner chamber,and stainless steel plate
+ spray painting for external chamber.
Insulation materialsHigh-temperature high-density amino acid ethyl ester foam insulator material.
SystemsP.I.D+S.S.R+Microcomputer balanced temperature control system.
Cooling systemsSemi-hermetic two-stage compressor (water-cooled) /
hermetic two-stage compressor (air-cooled).
Safety devicesFuse switch, high and low pressure protection switch compressors,
refrigerant pressure protection switch failure warning system, electronic siren.
FittingOutlook window (special purchase), the upper and lower adjustable
compartment two energized measured line hole, casters, level bracket.
Power3 phase AC380V 50HZ/60HZ
ControllerTanwan TATO or TH900C
CompressorGermany / Bock Brand

FRAME
 
The frame is made of various cold-rolled steel profiles (2 mm) with anti-corrosion protection. The outer casing consists of steel sheets (1 mm - 1.5 mm) cut with high-precision laser equipment and powder coated ..
 

The standard body has a technological hole with a diameter of 50 mm (optional additional technological holes up to 100 mm).

To reduce heat exchange with the environment between the working chamber and the body, there is thermal insulation using high-quality and durable insulation material.

 

Serial number
Volume
Inner size
D*W*H
Temperature range
Humidity range
Power 50hz/total rate (to be determined)
01
80L
400x400x 500
00~150°C
20~150°C
-40~150°C
- 50~150°C
-60~150°C
- 70~ 150°C
Selected according to test requirements
 
 
30~ 98%
220V/5 KW
02
100L
400x500x 500
220V/6KW
03
150L
500x500x 600
220V/6.5KW
04
225L
600x 500x750
220V/7KW
05
408L
800x 600x850
220V/7.5KW
06
800L
1000x800x1000
220V/7.5KW
07
1000L
1000x1000x1000
220V/8KW
Main indicators
a Temperature fluctuation: ≤±0.5°C, temperature uniformity: ≤+2°C
b Humidity error: ≤+2%/-3%R.H
c Cooling rate: 0.7~1°C/min, heating rate: 2~3°C/min
d Temperature change test chamber: cooling 3~5°C/min, heating 3~5/min
e Noise (dB)≤65 (all above are no-load)


 

How a Humidity Chamber Works

 

The main components of a humidity chamber are mechanisms that introduce moisture and heat. There are a variety of methods used to introduce moisture into the chamber, which can be in the form of a spray or bath. The same concept applies to heat that is supplied in the form of coils or heating elements.

 

In most cases, humidity chambers are designed, manufactured, and produced to fit the setting that the customer requires. Though there are many varieties of chambers, the basic components of heat and moisture are necessary to create the needed humid conditions.

 

 



 

 

 

We keep good quality and competitive price to ensure our customers benefit ; We respect every customer as our friend and we sincerely do business and make friends with them,no matter where they come from. Each batch of parts is done quality sampling inspection before into the warehouse, and Each product before delivery is tested by the national authoritative third-party inspection agency

 

We produce:
 
- Climatic and refrigerating chambers, cold treatment chambers;

- A variety of industrial and laboratory drying ovens;

- Testing temperature and climatic equipment;

- Muffle and chamber furnaces;

- Various equipment under the order according to the customer's specifications.


 

Product Tags: OEM Climatic Test Chamber   Antirust Climatic Test Chamber   TH900C Temperature Test Chambers  
Related Products
Email to this supplier
 
From:
Enter your Email please.
To: Guangdong ALI Testing Equipment Co,.Ltd
Subject:
Message:
Characters Remaining: (80/3000)