13A 220V 24 retractable programmable power meter cube socket
|
|
13A 220V 24 retractable programmable power meter cube socket
2.Description of timer switch
Power Meter Instructuin manual Power meter os a monitoring and testing instrument which determins the power consumption of a connected appliance and the cost of the electricity consumed. Installing the batteries Istall 3.6V rechargeable Bstterues(NI-MH).The purpose of the batteries is to store the total electricity and memory sertting. Reseting If an abnormal display appears or the buttons produce no response,the instrument must be reset.To do this ,pree the RESET button, Display Mode Entire LCD can be displayed for about 1 minute and then it automatically gets into model.To transfer from one mode to the other,press the RESET button, Applications :
More Products Choose
Company Information
Yueqing Kampa Electric Co.,Ltd. is Established in 1990.Has variety of goods ,such as Relay,Circuit breaker,Switches,Thermocouple,Thermostat,Temperature controller,Switch power supply,AVS,Heat sink,Heater,Distribution box,Junction box and so on.We are manufacturer and have ten years experience in Electrical industry. Our Services
A.Punctual delivery time:
B.After sales service:
|
|
16A Digital Time Switch CN102B DC/AC 24H/7D Programmable Timer |
|
Weekly Programmable Electronic Timer CN102B DC12V 24V AC110V 220V 16A Digital Time Switch |
|
7 days time controller automatically cycling voltage output TM618 programmable timer switch |
|
5000W 30A Weekly 7 Days Programmable Timer Controller AC 220V Digital Time Switch Relay |
|
Digital Timer Switch TM919 30A 220V Battery Built-in Countdown Electronic Time Controller |
|
2021 New TM919 30A Automatic Cycle Time Controller Battery Built-in Countdown Timer Digital Time Switch |
