China UV CIPP Equipment manufacturer
Daoyunai Energy Saving Technology Limited
Committed to underground pipeline CIPP and CCTV
4
Home > Products > UV CIPP Lining >

UV Pipe Lining Coating Sewer Inner Repair Sewer Liner CIPP Process No Dig

Browse Categories

Daoyunai Energy Saving Technology Limited

City: shanghai

Province/State:shanghai

Country/Region:china

Tel:86-136-4196-7601

Contact Person:
Mr.Aaron Wang
View Contact Details

UV Pipe Lining Coating Sewer Inner Repair Sewer Liner CIPP Process No Dig

Brand Name DAO
Place of Origin Jiangsu, China
Minimum Order Quantity 10m
Price Variable
Payment Terms T/T
Supply Ability 340 km per year
Delivery Time 15 working days
Packaging Details Normal
Material Lining sewers
Diameter DN300
Thickness 3mm
Length 460m
Weight Variable
Life 50 years
Detailed Product Description

UV light curing inner repair sewer liner by CIPP process no need digging

 

The UV light curing inner repair liner (hereinafter referred to as the liner) comprises the inner membrane, resin-impregnated glass fiber, outer membrane, and ultraviolet protective film from the inside to the outside.

 

1-Protective film: the plastic film on the outermost layer of the hose to protect the hose from ultraviolet radiation and avoid scratches during storage, transportation, pulling, etc.

 

2-Outer membrane: the plastic film on the second outer layer of the hose. The outer film material is a complete barrel film without the interface, which can better protect the resin impregnated with glass fiber braid from volatilization during the storage and transportation of the hose, and make the resin evenly distributed when the hose is inflated.

 

3-Glass fiber fabric: the main part of the hose is used to absorb the curing glue, increasing the pipe's strength after curing.

 

4-Inner membrane: the plastic film at the innermost layer of the hose, which protects the resin impregnated with glass fiber braid from volatilization during the storage and transportation of the hose, and makes the resin as evenly distributed as possible when the hose is inflated. After the hose is cured, the inner membrane shall be pulled out of the inner liner.

 

 How Plugging 
 Application Rain storm
 Length Any length is possible

 

Product Tags: uv lining processing DAO   DAO uv pipes coating   DAO uv linings process  
Related Products
Email to this supplier
 
From:
Enter your Email please.
To: Daoyunai Energy Saving Technology Limited
Subject:
Message:
Characters Remaining: (80/3000)