Custom Processing Automobile Transmission Equipment Shell Parts
|
【Part name】 Processing of shell parts of automobile transmission equipment 【Manufacturing process】CNC precision machining 【Surface treatment】 Grinding polishing + blue oil injection 【Product Features】 High precision complex structure 【Processing Equipment】 3-axis / 4-axis / 5-axis CNC machining centers (computer gongs), drilling tapping machines, CNC lathes, precision grinders, gantry milling machining centers, molding machines, hot-pressing tanks, western machines, wire cutting (fast / medium / slow walking) Wire) other processing equipment.
【Accuracy size】
Precision of metal parts:
Milling tolerance ± 0.01mm, turning tolerance ± 0.005mm
Plastic parts accuracy: ± 0.05mm
Size: 2200mm larger (removable parts are limited by size)
【Quantity Delivery】
Samples (1 order): 2-7 days
Small medium batch processing: 7-20 days
Mass production: 20-35 days 【material】
Metal: aluminum alloy, magnesium alloy, magnesium lithium alloy, low carbon steel, stainless steel, titanium alloy, copper, etc.
Plastic: ABS, PC, POM, PEEK, PP, acrylic (PMMA), nylon, Teflon, PPS, nylon + glass fiber, etc.
Composite material: carbon fiber
【Surface treatment】
After processing most of the surface of automobile shell parts, such as sand blasting, hard anodizing, micro-arc oxidation, grinding, polishing, oil spraying, blackening, electroplating, vacuum plating, chemical plating, phosphating, passivation, silk screen, flower Treatment process.
FAQ:
Q1: How to enjoy the OEM services? A1: Usually, base on your design drawings, we give some technical proposals and a quotation to you, after your agreement, we produce for you.
Q2: Can I get a sample for quality check? A2: Sure, We are willing to provide with sample for quality and function testing.
Q3: Will my drawings be divulged if you benefit? A3: No, we pay much attention to protect our customers’ privacy of drawings, we can sign NDA.
Q4: How do you control the quality? (1)Material inspection--Check the material surface and roughly dimension. ( 2)Production first inspection--To ensure the critical dimension in mass production. (3)Sampling inspection--Check the quality before sending to the warehouse. (4)Pre-shipment inspection--100% inspected by QC team before shipment.
Q5: How about the lead time? A5: Generally, 10 -15 days for samples, 25 -30 daysfor mass production.
|
Product Tags: Aluminum Alloy 6061 Automobile Parts Car Transmission Equipment Shell Parts |
![]() |
OEM ODM CNC Machining Parts Aluminum 6061 High Precision |
![]() |
Customized Stainless Steel CNC Turning Parts CNC Service OEM ODM |
![]() |
High Precision CNC Machining Parts Aluminum 6061 For Industrial Parts |
![]() |
OEM Custom CNC Machining Parts Anodizing Surface Treatment |
![]() |
High Precision CNC Mechanical Part Aluminum 6061 OEM ISO9001 |
![]() |
OEM Aluminum Custom CNC Parts CNC Turning For Auto Parts |