China International Cooling Tower Fill manufacturer
Wuxi Xianglong Plastic Technology Co., Ltd.
Wuxi Xianglong Plastic Technology Co., Ltd.
5
Home > Products > Cooling Tower Infill >

EAC PVC Cooling Tower Fills 1330mm Width Cooling Tower Fill Replacement

Browse Categories

Wuxi Xianglong Plastic Technology Co., Ltd.

City: wuxi

Province/State:jiangsu

Country/Region:china

Tel:86--18761578489

Contact Person:
Ms.Yaling
View Contact Details

EAC PVC Cooling Tower Fills 1330mm Width Cooling Tower Fill Replacement

Brand Name XL
Model Number XL-1330mm-EAC
Certification SGS
Place of Origin Jiangsu, China
Minimum Order Quantity 10/square meters
Price $1.6-2/ meters
Payment Terms Western Union, T/T, MoneyGram, D/P, D/A, L/C
Supply Ability 1000M/per pay
Delivery Time 10 working days
Packaging Details Wooden,cartons,custom package
Cooling Type Cooling Tower Parts
Material PVC,CPVC
Warranty 1 Year
Name Hanging 1330mm width cooling tower accessories pvc EAC fill sheet for cooling tower
Width 1330mm
Length 2440mm/customized
Sheet Spacing 20mm
Usage cooling tower
MOQ 10/square meters
Material Thickness 0.38-0.6mm
Detailed Product Description

Hanging 1330mm width cooling tower accessories pvc EAC fill sheet for cooling tower


Specifications:

 
Tech Date 
Sheet Width(mm)1330mm
Sheet Length2440mm/customized 
Thickness0.38-0.6mm/customized
Sheet Spacing20mm
Colorgrey/black

 

The principle of operation of cooling tower fill is to put as much water surface area in contact with as much air as possible, for the longest amount of time possible. Film fills allow the water to form thin flowing sheets to expose as much water surface area as possible to the interacting flow.
Cooling tower sheet fills or media, come in many different forms and "micro-structures," each having unique characteristics to fit various applications. Film fills are selected for direct replacement, performance enhancement, and water condition compatibility. Each fill has performance characteristics that allow selections to be made for various heat loads, flow rates, water quality, and horse power combinations.

 

 

 

 

 

 

 

 

Related Cooling Tower Film Fill

• Outstanding thermal performance, will meet or exceed the performance of any OEM fill
• Unique method for quick and easy field installation, saves labor
• Nested shipment requires smallest fill staging area and low shipping costs
• Model-specific kits contain everything needed for an efficient installation, including detailed instructions, supports, hardware, and fill
• 2-week standard lead time

PACKING AND DELIVERY

Q: Are you trading company or manufacturer ?
A: We are manufacturer with our own factory.


Q: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. Or it is 15-20 days if the goods are not in stock, it is according to quantity.


Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge. And the freight cost will on the buyer's side.


Q: What is your terms of payment ?
A: Payment<=USD1000, 100% in advance. Payment>=USD1000, 30% T/T in advance ,balance before shipment.


If you have other questions, please feel free to contact us as below:

 
 
Product Tags: SGS pvc cooling tower fills   EAC PVC cooling tower fills   1330mm width cooling tower fill replacement  
Related Products
Email to this supplier
 
From:
Enter your Email please.
To: Wuxi Xianglong Plastic Technology Co., Ltd.
Subject:
Message:
Characters Remaining: (80/3000)