China Railway Casting Parts manufacturer
Chongqing Hengtairail Equipment Co.,Ltd.
Global Rolling Stock Parts Supplier
5
Home > Products > Train Gangway >

Railway End CRCC Train Gangway Connection 970mm Through Witdh

Browse Categories

Chongqing Hengtairail Equipment Co.,Ltd.

City: chongqing

Province/State:chongqing

Country/Region:china

Tel:86-023-68502705

Contact Person:
Mr.Wei Dong
View Contact Details

Railway End CRCC Train Gangway Connection 970mm Through Witdh

Brand Name HT
Certification IRIS
Place of Origin China
Minimum Order Quantity 1pc
Payment Terms L/C, T/T, Western Union, MoneyGram, Paypal
Supply Ability 10,000 pcs/month
Delivery Time 15-50 days, depends on QTY
Packaging Details carton box, wooden case /as per requires
Price negotiable
Product name Gangway Connection
Brittleness temperature ≤-50℃
Working temperature -40 ℃ to 50 ℃ (-40 ℉ to 122 ℉)
Through height ≥1,885mm
Detailed Product Description

CRCC High Quality Gangway Connection For Raillway End of Car System

Product overview

Gangway Connection is one of the important part of locomotive and rolling stock. It has good longitudinal flexibility and lateral and vertical flexibility to meet the requirements of vibration during vehicle operation and safe passage of curves and turnouts.

 

Product specification

S.No.ItemValue
1CertificateIRIS, ISO9001, CRCC, EN15085
2StandardIRIS 80845:2021 TB/T 3094-2015
Working conditionTemperature-40 ℃ to 50 ℃ (-40 ℉ to 122 ℉)
Relative humidity(The monthly average minimum temperature was 25)≤95%
Altitude≤ 1,500m
maximum wind speed≤ 15m/s, occasionally 33m/s
3Through witdh≥970mm
4Through height≥2,000mm
6Hardness73±3(shore A)
7Brittleness temperature≤-50℃

 

Product advantages

· Heat-shielding performance improved, heat transfer coefficient K≤5.0W/(m2·k)

· Ability to pass curves improved, the minimum curve radius that can be passed when connecting is as low as to R145M

 

 

Below is there different types of  Gangway Connection FYI

S.No.TypeFeaturesPicture
1EMU High-speed Train GangwaySmall passage width 
No interior panel (roof panel & side panel), simple structure
High requirements to sound insulation, thermal insulation, air tightness
Meet the aerodynamic load requirement for trains meeting with high speed
2Metro GangwayBig passage width 
Most of projects have interior panel
Sound insulation 27~40dB, no air tightness requirement;
Meet the requirements of quick connection and disconnection
3Tram GangwayBig passage width, outer profile is almost same size as car body 
Usually without interior panel
Sound insulation 12~25dB, no air tightness requirement
Puckered type, meet small curve passing requirement

 

 

 

Structure of  Gangway Connection

 

 

Application

 

 
Product Tags: CRCC Train Gangway Connection   Train Gangway Connection 970mm   CRCC train end gangways  
Related Products
Email to this supplier
 
From:
Enter your Email please.
To: Chongqing Hengtairail Equipment Co.,Ltd.
Subject:
Message:
Characters Remaining: (80/3000)