China Railway Casting Parts manufacturer
Chongqing Hengtairail Equipment Co.,Ltd.
Global Rolling Stock Parts Supplier
5
Home > Products > Train Gangway >

Sound Insulation Train End Gangways Vertical Flexible 73 Hardness

Browse Categories

Chongqing Hengtairail Equipment Co.,Ltd.

City: chongqing

Province/State:chongqing

Country/Region:china

Tel:86-023-68502705

Contact Person:
Mr.Wei Dong
View Contact Details

Sound Insulation Train End Gangways Vertical Flexible 73 Hardness

Brand Name HT
Certification IRIS
Place of Origin China
Minimum Order Quantity 1pc
Payment Terms L/C, T/T, Western Union, MoneyGram, Paypal
Supply Ability 10,000 pcs/month
Delivery Time 15-50 days, depends on QTY
Packaging Details carton box, wooden case /as per requires
Price negotiable
Product name Pucker Vestibule Diaphragm
Certificate IRIS, EN15085-2, ISO9001, CRCC, UIC845-75
Working temperature -40 ℃ to 50 ℃ (-40 ℉ to 122 ℉)
Tensile strength ≥ 17MPa
Brittleness temperature ≤-50℃
Abrasion value ≤0.3 cm³/1.61km
Detailed Product Description

End Of Car system UIC845 standard sound insulation pucker vestibule diaphragm for railway spare parts

Product overview

Pucker Vestibule Diaphragm  is one of the important part of locomotive and rolling stock. The Pucker Vestibule Diaphragm is installed at the junction of the adjacent two carriages at the end of the vehicle, so that the two carriages form a complete passage.

 

Product specification

S.No.ItemValue
1CertificateIRIS, ISO9001, CRCC, EN15085
2StandardIRIS 80845:2021 TB/T 3094-2015
Working conditionTemperature-40 ℃ to 50 ℃ (-40 ℉ to 122 ℉)
Relative humidity(The monthly average minimum temperature was 25)≤95%
Altitude≤ 1,500m
maximum wind speed≤ 15m/s, occasionally 33m/s
3Through witdh≥970mm
4Through height≥2,000mm
6Hardness73±3(shore A)
7Brittleness temperature≤-50℃

 

Product advantages

Compared with rubber gangway, pucker vestibule gangway has below advantages:

· Air tightness improved, the leakage time when the air pressure in the gangway drops from 3600Pa to 1350Pb is not less than 50s.

· Sound insulation performance improved, sound reduction index RW≥25dB

 

Below is there different types of Interconnecting Gangway FYI

S.No.TypeFeaturesPicture
1EMU High-speed Train GangwaySmall passage width 
No interior panel (roof panel & side panel), simple structure
High requirements to sound insulation, thermal insulation, air tightness
Meet the aerodynamic load requirement for trains meeting with high speed
2Metro GangwayBig passage width 
Most of projects have interior panel
Sound insulation 27~40dB, no air tightness requirement;
Meet the requirements of quick connection and disconnection
3Tram GangwayBig passage width, outer profile is almost same size as car body 
Usually without interior panel
Sound insulation 12~25dB, no air tightness requirement
Puckered type, meet small curve passing requirement

 

 

Application

 

 
Product Tags: sound insulation train end gangways   Train End Gangways Vertical Flexible   sound insulation Train Diaphragm  
Related Products
Email to this supplier
 
From:
Enter your Email please.
To: Chongqing Hengtairail Equipment Co.,Ltd.
Subject:
Message:
Characters Remaining: (80/3000)