China Instant Noodle Production Line manufacturer
Henan Dongfang Noodle Machine Group Co., Ltd.
Create Perfect Products with Excellent Characters Satisfy Customers with Various Products Add Value to Goods Add Color to Life
4
Home > Products > Stick Noodles Production Line >

Fully Automatic Stick Noodles Production Line Plant ISO9001 CE

Fully Automatic Stick Noodles Production Line Plant ISO9001 CE

Brand Name Dongfang
Model Number HNT-765
Certification ISO9001, CE
Place of Origin Henan, China
Minimum Order Quantity 1 SET
Price Negotiable
Payment Terms L/C, T/T
Supply Ability 200 sets per year
Delivery Time 60-120days
Packaging Details Simple packaging; wooden box packaging
Name HNT-765
Machinery Capacity 36ton/24h
Number of Workers Required 4 people(not including packaging machine)
Condition New
Usage Full-automatic,Food Processing Industry
Detailed Product Description

Stick Noodle Machinery Manufacturing Process Fully Automatic Stick Noodle Plant

 

Our company was founded in 1975, which is the largest noodle machine manufacturer in China. It is a company with technology researching, manufacturing and marketing. All the noodle equipment have passed ISO9001 and CE Certification.

 

Main Technical Parameters:

 

Product NameDry Stick Noodles Production Line
Production Capacity36T/24h
Roller Size1000mm
Total Power110KW
Equipment Area90*11*5m
Material304Stainless Steel

 

Electrical Control System:

 

Adopt international first-line brand, safe and reliable;

The whole line realizes automatic control, with sensitive feedback and control

precision;

Through Ethernet communication interface and Internet cloud technology

Retrieve data for remote control and fault analysis.

 

FAQ:

 

What are the raw materials used on the machine?

Our production line mainly uses food-grade SUS304, SUS316, POM and silicone parts that meet hygienic standards, as well as international brand electrical components. We can also make any custom design for you according to your needs.

 

When can I get an engineer from you?

When you have finished preparing the conditions (water, electricity, gas supply, production materials), contact our sales staff. We will send engineers to install your machine and train your staff to use it. Usually, when you are ready, you can contact our sales staff and cooperate with us to process the visa for the engineer, the engineer will arrive within 15 days.

 

How will my machine be installed when it arrives? how much does it cost?

We will send an engineer to your facility to assess the situation, install the machine and train your staff how to operate it. Clients pay for round-trip airfare, accommodation and salary/day/person.

 

Product Tags: Stick Noodles Production Line Plant   ISO9001 Stick Noodles Production Line   Stick Noodle Plant ISO9001 CE  
Related Products
Email to this supplier
 
From:
Enter your Email please.
To: Henan Dongfang Noodle Machine Group Co., Ltd.
Subject:
Message:
Characters Remaining: (80/3000)