304 Stainless Steel Round Pipe Tube Hot Cold Rolled Slit Edge 0.5mm
Thickness 8mm OD Product Description: Stainless steel pipe is a hollow strip of circular steel, mainly
widely used in petroleum, chemical, medical, food, light industry,
mechanical instrument and other industrial pipeline and mechanical
structure parts. Stainless steel pipes are made of acid and heat resistant billets,
heated, perforated, sized, hot rolled and cut. Product Name | stainless steel pipe | Thickness | 0.1-200mm | Length | 3000mm,5800mm,6000mm,9000mm,12000mm,etc. | Diameter | 3-1220mm | Standard | ASTM,JIS, AISI, GB, DIN, EN | Surface | BA,2B,NO.1,NO.4,4K,HL,8K | Certification | ISO, SGS | Technique | Cold Rolled Hot Rolled | Edge | Mill Edge Slit Edge | Quality | SGS Inspection | Payment Terms | T/T L/C and Western Union etc |
Chemical Composition Reference | Grade | C≤ | Si≤ | Mn≤ | P≤ | S≤ | Ni | Cr | 201 | 0.15 | 1.00 | 5.50-7.50 | 0.5 | 0.03 | 3.50-5.50 | 16.00-18.00 | 202 | 0.15 | 1.00 | 7.50-10.00 | 0.5 | 0.03 | 4.00-6.00 | 17.00-19.00 | 304 | 0.08 | 1.00 | 2.00 | 0.045 | 0.03 | 8.00-11.00 | 18.00-20.00 | 304L | 0.03 | 1.00 | 2.00 | 0.045 | 0.03 | 8.00-12.00 | 18.00-20.00 | 309 | 0.20 | 1.00 | 2.00 | 0.04 | 0.03 | 12.00-15.00 | 22.00-24.00 | 309S | 0.08 | 1.00 | 2.00 | 0.045 | 0.03 | 12.00-15.00 | 22.00-24.00 | 310 | 0.25 | 1.00 | 2.00 | 0.04 | 0.03 | 19.00-22.00 | 24.00-26.00 | 310S | 0.08 | 1.00 | 2.00 | 0.045 | 0.03 | 19.00-22.00 | 24.00-26.00 | 316 | 0.08 | 1.00 | 2.00 | 0.045 | 0.03 | 10.00-14.00 | 16.00-18.00 | 316L | 0.03 | 1.00 | 2.00 | 0.045 | 0.03 | 10.00-14.00 | 16.00-18.00 | 316Ti | 0.08 | 1.00 | 2.00 | 0.045 | 0.03 | 10.00-14.00 | 16.00-18.00 | 410 | 0.15 | 1.00 | 1.00 | 0.04 | 0.03 | 0.60 | 11.50-13.50 | 430 | 0.12 | 0.12 | 1.00 | 0.04 | 0.03 | 0.60 | 16.00-18.00 |
Product details:
Application:
Production Line:
Packing:
Related Products:
FAQ: Q: How long is your delivery time? A: For Stocks, we can send the goods to loading port wiyhin 7 days
after receiving the deposit ;For production period,it usually needs about 15 days ~30 days after receiving the deposit. Q:Can we visit your factory? A: Warmly welcome. Once we have your schedule, we will arrange the
professional sales team to follow up your case.
|