Company Profile Xinguang Zheng Group was established in 1997, after more than 20
years of steady development, it has now become a high-tech,
diversified and export-oriented international private enterprise
integrating research and development, design, production,
installation and construction and service.
Project Cases Project Name: Zhongjie Era Overpass Project Address: Qingdao, China Project Brief Description:Zhongjie Era Overpass Project is Pingdu's
first cross-street bridge project, the whole project consists of three overpasses, the east side of
the straight overpass bridge length 56.3 meters wide 5 meters, the west side of the straight overpass
bridge length 49 meters wide 5 meters, the middle of the circular overpass main bridge diameter 56
meters, petal shape, the narrowest 6.5 meters wide 12 meters. | | Project name:Guangming Conference Center of China Flower Expo Project address:Shanghai, China Project Brief Description: China Flower Expo Shanghai Guangming
Convention Center project is located in Dongfeng Farm, Chongming District, Shanghai, covering an
area of about 2000 ㎡. It is a steel and wood mixed structure. The main steel structure project is
undertaken by XGZ, which adopts pipe truss structure for production and installation. After the
completion of the project, it will be used to hold conferences and press conferences during the Expo. | | Project name: Audi Exhibition Hall in Uruguay Project address:Montevideo, Uruguay Project Brief Description: The project building area is 4,587
square meters. It contains exhibition hall and workshop, and is the first Audi 4S shop in Montevideo, the frame of
the exhibition hall part is truss structure, while that of the workshop is portal steel frame. The
wall enclosure is made of 100mm thick PU composite panel and sandwich panel; the roof enclosure made of
100mm thick foam composite panel (weight of foam 20kg). | | Project name:Testing Plant in Israel Project address:Israel Area:610 square meters Completion time:the year of 2020 Application:Car testing center This project adopts circle-castellated steel beams and square tube
trusses,all structures were treated with hot-dip galvanized. | |
Customer Service | 3D DESIGN | 3-Dimensional Design | | 360 Degree All-side Display |
| SOLUTION | Professional Project Analysis Engineer | | Customized and Detailed Drawing | | Thorough and Safe Erection Plan |
| PRE-ASSEMBLING | Production Pre-assembling | | Connection Match Testing | | Production Quality Guarantee |
| PACKING | Packing | | Quality Guarantee | | Reasonable Space Distribu |
| OUR CLIENTS OVERSEA | Sincere Smile | | Thanksgiving Reception | | Faithful Communication |
CHASING DREAMSCHASING DREAMS WITH EACH PASSING DAYWITH EACH PASSING DAY 1997 - 2002 | (2002) The first steel structure production line was completed and
put into operation, and the company completed the transformation
from steel trade to steel structure material production and trade (2002) Qingdao Xinguangzheng Steel Structural Materials Co., Ltd.
was established, which opened a new division in the history of
Xinguangzheng development and opened a new milestone in the history
of Xinguangzheng development (2001) The first C-type steel production equipment was put into
operation, and the production and processing scope continued to
expand (2000) The first composite plate production line was launched, and
the processing scope was further expanded (1997) The purchase of the first wave tile press marked the
company's entry into the era of steel structure material processing
from steel marketing; The company entered the era of steel
structure material processing by steel consignment (1997) Invested in the construction of the factory, Pingdu
Guangzheng Industry and Trade Co., Ltd. was established | 2003 - 2008 | (2008) International business companies have been established,
international business has entered a stage of rapid development,
investment and construction of steel business has entered a stage
of rapid development, investment and construction of a steel
structure plant, while two steel structure production lines have
been put into use, while two steel structure production lines have
been put into use (2006) Obtained the second-class qualification of steel structure
construction (2005) Completed the transformation from steel structure material
trade to steel structure engineering transformation project (2004) Invested in the construction of steel structure supporting
plant area, specializing in the production of steel structure
engineering maintenance materials (2004) Obtained the Grade 3 qualification of steel structure
construction (2003) The construction of steel structure project started | 2009 - 2013 | (2013) Invested in the construction of the third steel structure
plant, and built the container house production workshop in the
same year (2012) The company takes the management of PK work and profit
amplification as the main line, and continues to deepen and improve
the main line, continue to deepen and improve (2011) Obtained the high-tech enterprise Certificate (2010) Determine three strategic adjustments: talent structure,
product structure, business structure three structural adjustments,
marking the product structure, business structure three structural
adjustments, marking the company began to enter the stage of
standardized management (2009) The company proposed strategic transformation: From
management-oriented to management-oriented, from
management-oriented to management-service-oriented, from
management-oriented to management-service-oriented, from
leader-driven development to leader-driven, employee
transformation, from leader-driven development to leader-driven,
employee driven development, to the leading product extension and
bigger, do to promote development, Extend to the leading products
and make them bigger, stronger, do fine transformation, do fine
transformation | 2013 - 2016 | (2016) Obtained the Grade 3 qualification of general contracting
for construction. The company established the strategy of
"informatization" and "going out", and set up branches in Algeria
and Ethiopia (2015) Won the famous trademark of Shandong Province (2014) Obtained the first-class qualification certification of
professional contracting of steel structure engineering (2013) Determined to take corporate financial data as management
guidance and prepare for the listing of enterprises | 2016 - future | (2020) Enterprise platform, ecological chain and trust chain
construction, self-fission system construction (2019) India Joint venture was established (2018) The "four new models" help the development of "steel
structure +" : new products, new technologies, new models, and new
formats (2017) proposed to build the whole industrial chain based on "steel
structure +"; Obtained the Ministry of Commerce and SASAC issued
the enterprise credit evaluation AAA credit enterprises (2016) contracted the construction of the new factory area of Levy
and Joint-stock Company, laying a solid foundation for the
development of the company's general contract project in the later
stage (2016.10) Obtained the qualification certificate of foreign
contracted projects |
|