China Pre-Insulated Pipe Production Line manufacturer
Qingdao Huashida Machinery Co., Ltd.
2
Home > Products > 3LPE Coating Pipe Production Line >

Advanced FBE Coating Machinery for Internal External Steel Pipes 3LPE 2LPE

Advanced FBE Coating Machinery for Internal External Steel Pipes 3LPE 2LPE

Brand Name Huashida
Model Number 300-4200mm
Certification CE, ISO, RoHS
Place of Origin Qingdao China
Minimum Order Quantity 1
Price US$100,000.00-3,000,000.00
Payment Terms L/C,T/T,Western Union,MoneyGram
Supply Ability 30 Sets/Year
Delivery Time 60days
Packaging Details Standard Package
Condition New
Specification 1200.00cm * 230.00cm * 260.00cm
HS Code 8477209000
Detailed Product Description
Advanced FBE Coating Machinery for Internal External Steel Pipes 3LPE 2LPE
 
Product Description


The epoxy powder anti-corrosion process for the inner and outer walls of steel pipes is currently an efficient and reliable solution for pipeline anti-corrosion. The treated steel pipe has significant advantages: its coating not only has excellent corrosion resistance, capable of resisting the long-term erosion of various chemical media such as acids, alkalis and salts, but also has a smooth and dense surface structure, which can effectively reduce the frictional resistance during fluid transportation and improve the transmission efficiency of the pipeline. This type of anti-corrosion steel pipe, with its outstanding comprehensive performance, is widely used in multiple key fields such as long-distance oil and gas pipelines, urban water supply and drainage networks, and industrial fluid transportation.


Internal & External FBE Powder  coating 

Epoxy powder is a thermosetting non-toxic coating. After curing, it forms a high-molecular cross-linked structure coating, which has excellent chemical anti-corrosion performance and mechanical strength. Its base layer is bonded and cured on the surface of the steel pipe to form a continuous coating, providing excellent adhesion, chemical corrosion resistance and cathodic disbondment resistance. Polymer adhesives bond epoxy powder before gelation and connect the top layer of polyethylene, making the three-layer structure closely combined into one.



Main equipment:

Item Process Flow 
1Upload pipes
2pipes sprial conveyor
3external blasting 
4internal blasting
5Rust removal
6intermediate frequency heating
7FBE powder coating 
8Powder recycling system
9load down pipe rack

 

Detailed Photos


            

Our Advantages

√ Set up domestic high-end plastic machinery expert workstation, with more than 10 patented technologies
√ 9 senior engineer team, refined FBE powder curing parameters and 3LPE interlayer bonding process
√ 4000 m2 intelligent factory, strict implementation of ISO9001 quality control system
√ 100% test run before the equipment leaves the factory, the operation stability reaches 99.8%
√ Set research and development, production in one, to ensure the technology and equipment performance

FAQ

Question & Answer:

Q1. What is Size of Pipe Dia. your equipment can produce ?
A: We can produce four main Model:
Diameter of steel Pipe:
48-219mm.
219-1220 - mm
325-1600 - mm
508-2400 - mm
1000-3200mm


Q2. What is Descaling grade?
A:SA2.5?

Q3. What is your anticorrosion coating standard?
A: It can meet  SY/T0413-2002 ,GB/T23257-2009, German DIN 30670 , DIN 30678 and  coating specification requirements from American Corrosion Association, and DNV . The product pipe fully complies with  SY/T0315-2005 ,CNPC38-2002 "Technical specifications for double-layer fusion-bonded epoxy powder coating on buried steel pipe and Canada, American Corrosion Association standards.

Q4. What is Delivery Time
A: 2-3monthes after deposit.

Q5. Production output:
A: It is different output capability as different pipe diameter, the Max. is 3 to 8 km/day, and annual processing capacity is 2 million square meters (Φ508 mm).

Q6. Coating thickness:
       A: 80~800um

Q7. Which country did you sell your 3PE equipment?
A. We have produced nearly 50sets 3PE processing line at home and abroad. Such as Russia, Iran, UAE, Iran, India, Belarus, Kazakhstan and so on.

Q8. After-sales service: 
A:  Warranty period:
Before delivery all the equipment must be trial operated  to confirm the quantity perfectly.
The warranty period is 12 months from the date of pick-up for mechanical part , and 6 months  for the electrical part. The seller provides free technical services and provides training and guidance to buyer operators.


International Trading show


Clients case

Certifications

Product Tags: 3LPE Coating Production Line   Steel Pipe Anti Corrosion Production Line   3LPE Coated Steel Pipe Machine  
Related Products
Email to this supplier
 
From:
Enter your Email please.
To: Qingdao Huashida Machinery Co., Ltd.
Subject:
Message:
Characters Remaining: (80/3000)