Automated Production 3lpe Pipe Line Internal External Fbe Powder
Coating Machine
Product Description
Internal & External FBE Powder coating
Epoxy powder, as a thermosetting non-toxic coating material, forms
a high-molecular cross-linked structure coating after curing, which
combines excellent chemical anti-corrosion performance with
mechanical strength. Its base layer is bonded and cured on
the surface of the steel pipe to form a continuous and dense
coating, providing excellent adhesion, chemical corrosion
resistance and cathodic disbondment resistance. The polymer
adhesive bonds the epoxy powder before gelation and is closely
connected with the top layer of polyethylene, making the
three-layer structure a unified protective whole.
It has the following characteristics:
1. Efficient anti-corrosion technology
Steel pipe inside and outside the epoxy powder anti-corrosion,
chemical corrosion resistance, long anti-corrosion life.
2. Coating performance advantages
Smooth surface and small friction, improve medium delivery
efficiency and reduce energy consumption.
3. Wide application fields
Oil/gas transportation, water supply and drainage pipelines and
other key projects preferred anti-corrosion solutions.
Detailed Photos
Our Advantages
√ Qingdao Huashida---20 years pipeline anti-corrosion equipment
manufacturer
√ A total of 389 sets of equipment have been delivered,
serving 20 + countries around the world, and building an
international standard anti-corrosion production line
√ It has domestic high-end plastic machinery expert
workstations and more than 10 patented technologies
√ 9 senior engineer team, master FBE powder curing parameters,
3LPE interlayer bonding key process
√ 4000m2intelligent factory, strict implementation of
ISO9001 quality system
√ 100% test run before leaving the factory to ensure the
stability of the equipment operation up to 99.8%
FAQ
Question & Answer:
Q1. Production line parameters?
A:(1) Steel pipe coverage: 114mm-4200mm
(2) Processing capacity: ≤250m² /h
(3) Cleaning level: Sa2.5
(4) Materials used: dissolved epoxy resin powder
Q2. Main equipment?
A:(1) Upload pipes
(2) pipes sprial conveyor
(3) external blasting
(4) internal blasting
(5) Rust removal
(6) intermediate frequency heating
(7) FBE powder coating
(8) Powder recycling system
(9) load down pipe rack
Q3. Delivery Time?
A: 2-3 months after deposit confirmation
Q4. Coating Thickness?
A: 80-800 μm (customizable)
Q5. Export Countries?
A: Russia, UAE, India, Iran, Kazakhstan, Belarus, etc. (50+ lines
installed globally)
Q6. Warranty & Support?
A: 12-month mechanical warranty / 6-month electrical warranty;
Free training & technical guidance