China Pre-Insulated Pipe Production Line manufacturer
Qingdao Huashida Machinery Co., Ltd.
2
Home > Products > Polyurethane Spraying Foam Preinsulated Steel Pipe Making Machine >

Polyurethane Spraying Foam HDPE Winding Protective Jacket Pre Insulated Steel Pipe Equipment

Polyurethane Spraying Foam HDPE Winding Protective Jacket Pre Insulated Steel Pipe Equipment

Brand Name HUASHIDA
Certification ISO9001
Place of Origin Qingdao,Shandong,China
Minimum Order Quantity 1
Payment Terms L/C, D/A, D/P, T/T, Western Union, MoneyGram
Delivery Time come to an agreement in respect of the delivery time
Packaging Details Packing according to Machine
Pipe Usage PU Pre-Insulation
Insulation Material Polyurethane Foam
Control System PLC
Cooling Method Water Cooling
Operating System Touch Screen
Installed Power about 800 kW
Detailed Product Description

Polyurethane Spraying Foam HDPE Winding Protective Jacket Preinsulated Steel Pipe Equipment

 
Product description

The polyurethane sprayed polyethylene thermal winding insulation pipe production line independently developed by Huashida, consists of three parts: External shot blasting and derusting production line, polyurethane spraying production line, and PE winding production line. The line has a number of national patents, and the third-party standardized evaluation report has a technology advanced level of 5, reaching the domestic leading level. And won the first set of technical equipment in Shandong Province.

 

 

Technological flow:

Upload pipes→pipes conveyor→rust removal→intermediate frequency heating→Epoxy powder coating→Middle layer &polyethylene stripe winding→water cooling→pipes conveyor→ pipe chamfer→unload pipes



5. Trim the pipe ends

 

Features of the polyurethane spraying PE winding insulation pipe

(1). Density, thermal conductivity, compressive strength and other indices of the polyurethane insulation layer are uniform and consistent. Therefore overall performance of the pipe is superior.
(2). The polyurethane insulation layer is formed by free foaming. Since polyurethane is foamed perpendicular to the axial direction of the pipe, compressive strength of the insulation layer is improved.
(3). The polyurethane insulation layer is formed after spraying. The raw materials are sprayed onto the outer surface of the steel pipe in a liquid form, and then begins to foam. Due to the high reaction activity of the spraying polyurethane raw materials, adhesion between steel pipe surface and polyurethane foam layer is stronger.
(4).Roughness of the surface of polyurethane foam layer is more conducive to increase bonding effect between insulation layer and outer HDPE protective layer.

 

 

Qingdao Huashida Machinery Co., Ltd was established in 2003. Since its inception, Huashida has focused on plastic polyurethane insulation pipe production line, 3PE anti-corrosion pipe production line, large diameter underground pipe production line and plastic pipe joints for 20 years. We always attach great importance to research and development,
collaborating closely with Beijing University of chemical technology, Qingdao university of technology and scientific research institutions. by absorbing advanced technology home and abroad, after 20 years of endeavor we now rank one of the top 3 manufacturers in the industry in China. Huashida machines have been well received in Saudi Arabia, Kazakhstan, Uzbekistan, United Arab Emirates, Turkey, Russia, etc.



Main accessories

 


No.

(DN)

The thickness of the insulation layer

Outer casing dia.

Min. thickness of the outer casing
150030-60598-6584.5
260030-60700-7605.0
370030-60790-8505.0
480030-60891-9515.5
590030-60992-10526.0
6100030-601093-11536.5
7110030-601194-12547.0
8120040-1001316-14368.0
9140050-1001538-16789.0
10162050-1001738-184010.0
 
 
 
 
Product Tags: Polyurethane Pre Insulated Steel Pipe Equipment   HDPE Pre Insulated Steel Pipe Equipment   Jacket Pre Insulated Steel Pipe Equipment  
Related Products
Email to this supplier
 
From:
Enter your Email please.
To: Qingdao Huashida Machinery Co., Ltd.
Subject:
Message:
Characters Remaining: (80/3000)