Steel Frame Homes With Low Carbon Steel Q235 Q345 Main Structure
|
Detailed Product Description
|
Prefab Engineered Roof Frames Building with Low Carbon Steel Q235
Q345 Main Structure Products Description Pre Fabricated Building Steel Structure Wedding Halls Prefabricated
School Units Prefab Engineered Roof Frames Building Construction
Costs The light steel villa utilize the 100% cold-bend thin wall steel as
the structure body and can be used to build buildings within 6
floors. The main building component of this system is the frame
bridge,which is composed by the galvanized cold-bending high
frequency welded light thin wall rectangular pipe and the
triangle.C type, triangle v type connection. All these
prefabricated components are transferred to the construction site
to be installed into the structure body. After that the interior,
exterior wall panels and roof profile panels are laid out, while
the heat and sound insulation material are filled into the space in
the wall and floor deck. This product solve the problem of "hot
bridge,bad fire resistance". Advantages 1. Industrialized
production with fast manufacturing speed and high precision; 2.
Good looking,stable structure,good anti-shock and anti-corrosion
property; 3. Cold-rolled thin wall light steel structure system
building has lighter weight,shallow base,low pricing; 4. No need
for large scale machines on the construction site. Fast
installation. The construction of a 200m2 two-story villa can be
completed by 6-8 skilled workers in about 20 days; 5. Convenient
package and transportation:the transportation process is fully
considered into the product design,optimize the load method, with
about 130-150 m2 per 40 foot container; 6. The wall and roof panel
is enclosed by multi-type material,which makes the walls of the
building breathable and enhance a more comfortable residence in it. 7. The construction site is no wet, environment friendly, not
seasonally restraint; 8. With the satisfaction of the functional needs,the wall is
thinner,which increase the effective usage area of the building; 9. Customizable.
The light steel villa adopts the 0.8-1.5mm thickness galvanized C/U
type steel (Q550DTz) as frame and install with composite wall and
roof (OSB Panel/ Glass wool for heat and sound insulation/
Decorative panels for inside and outside). It's a kind of
fabricated type wall bearing system, has the characteristic of
light weight, large span, anti-seismic, hurricaneproof, thermal
insulation, sound insulation and so on. And due to the industrial
production of precast, components of composite wall panels, floor,
and roof, during the installation it don't need welding, coating so
quick installation can be achived. * We have over 15+ years in the construction of building materials,
pre-engineered steel buildings. * Offer a much cheaper price with advice to help you control and
balance the budget with the design of the building, construction
materials, minimizing the cost of delivery. * Professional because of many experiences in designing steel
buildings - manufacturing many construction works. Container house is a constructionproduct which is
mobile,prefabricated and reusable.The house adopts standardized
design,factory production,and takes cabinet as the elemental
unit.Container house is not only fit for individual usage,but also
for spacious room application formed by various horizontal and
vertical direction combination.Container house structure uses
standardized structural elements that are weled by profile steel or
cold-formed thin-wall steel.Combined container houses is connected
and fastened by high strength screws,so that house structure is
simple,easy to install.Container house is widely used for real
estate development exhibition hall,product sale showroom,temporary
reception center,commercial temporary office,and store and so on. Details Images Features: Advantages: Why Choose Us to offer steel structure workshop building: 4. Efficiency is our pursuit. Every inquiry ,emails will be replied
immediately. Every questions will be paid high attention. 5. We
also have possessed more than 40 sets of large precise and
domestically advanced processing equipments, including large gantry
planing machines, automatic submerged arc welding machines,
assembling machines, slitters, shot blasting machines and soon.
6.We will offer details packing list for every container when load
so it will be easier to unload. 7. "Moral personality decides product quality." is our guarantee to
the products. "Customers come first." is our everlasting pursuit.
Believe your choose, we'll give you a satisfied answer.
Steel Structure Shandong Juhe Steel Co. LTD Was founded in 2013. After more than 10 years of steady
development, It has now become a high-tech, diversified,
export-oriented international private enterprise integrating
research and development, design, production, installation and
construction and service. manufacture enterprises in China, also
has waterproof anti-corrosion insulation engineering, construction
curtain wall engineering, building engineering construction general
contracting qualification, be included in the construction industry
modernization production base in Shandong province. The core
competitiveness of the company comes from the unremitting pursuit
of technological breakthroughs. Now, there are more than 100 senior
technical personnel of various kinds, and many universities and
scientific research institutions to establish cooperative
relations. With the help of internal and external intellectual
resources, relying on steel structure, we continue to innovate in
various aspects and achieve new breakthroughs. Construction process Steel Structure fixed packing, loading, transportation, unloading the matters needing attention:(1) The lifting large there must be a person responsible for the
use of fixture, suitable, strictly abide by the rules of lifting, to prevent the occurrence of vibration, impact, deformation or damage, fall in the hoisting process. (2) At the time of loading, there must be a special supervision, check car number and packing, the car pile up securely, and to increase the necessary binding component loosening, prevent the loss. (3) Remained stable in the transport process, the vehicle at the time of shipment, on the long, wide, high object transport, must be trained pilots, escort personnel responsible for, and mark is arranged on a vehicle. (4) No rough handling, loading and unloading personnel handling,
weight, size should be familiar with the components, and check the
horse sling, rigging, prevent accidents. (5) The member to the construction site, timely organization of unloading, stacking area. (6) The crawler crane carrying member, should pay attention to the surrounding terrain, air condition, prevent the crawler crane overturning and component collision. FAQ Pre Fabricated Building Steel Structure Wedding Halls Prefabricated
School Units Prefab Engineered Roof Frames Building Construction
Costs Q1: Why choose JUHE ? A: At JUHE, the customer is the first priority. We don't pull any
gimmicks. We are veteran owned and operated business, unmatched in
customer service. We have more than 10 years of light steel villa
experience. We are also very reputable manufacturer and can answer
your questions regarding any tape of construction project. We care
about your needs and value your business. Q2: How can l get the quotation of the project ? A: lf you have drawing ,we can offer you our quotation according
to your drawing . If you have no design, our engineer will design
some drawings for you to confirm. And then offer you a quotation. Q3: Do you offer designing service for us? A: Yes, we could design full solution drawings as your
requirements. By using AutoCAD, PKPM. MTS, 3D3S, Tarch, Tekla
Structures (X steel) and etc. We can design complex light steel
villa and industrial building like office mansion, supermarket,
auto dealer shop, shipping mall, hotel etc. Q4: Do you provide samples of materials? ls it free or extra? A: Yes, we could offer the sample for free charge but do not pay
the cost of transport costs. Q5: What is your terms of payment ? A: LC,T/T,Western Union Q6: How long is your delivery time? A: Generally it is within 25-45 days ,definitely according to
quantity and color. Q7: How about your quality control? A: We have our own professional quality control team with rich
experience and advanced inspection equipment. Also we are willing
to accept any other the third inspection part to control. Q8: Can you provide the installation help? A: We will provide detailed instruction photos and videos to you.
If it is necessary, we will send professional engineers to do the
construction guidance, and some skilled workers to help
installation. However, the visa fee, air
tickets,accommodation,wages will be provided by buyers. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Product Tags: q235 steel frame homes q235 steel frame high rise buildings q355 steel frame homes | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Related Products
|
China factory High quality house prefabricated ready to ship container homes |
|
Steel Frame Homes With Low Carbon Steel Q235 Q345 Main Structure |
|
Camping Guesthouse Steel Structure Space Capsule For Hotel |
|
Modern Modular Space Capsule House with Galvanized Steel Frame |
|
Mobile Space Capsule House With Customized Color Combination |
|
Container Houses For Modern Hangfa Space Capsule Container Mobile House |
Email to this supplier
