China Laser Welding Machine manufacturer
Wuxi Octetally Tech Co., Ltd
Wuxi Octetally Tech Co., Ltd
3
Home > Products > Wind Tower Production Line >

Tower Painting Welding Rotator Move-On-Rails With Manual Travel Device

Tower Painting Welding Rotator Move-On-Rails With Manual Travel Device

Place of Origin PR.CHINA
Brand Name OTA
Certification CE, ISO
Minimum Order Quantity 1SET
Packaging Details WOODEN PALLET
Delivery Time 10-15 DAYS
Payment Terms L/C, T/T
Supply Ability 100SETS/MONTH
Detailed Product Description
It is composed by one power unit, one idler unit , travel basement and control system. The slot is deigned on the rollers to fit the flange, to avoid painting damage when tower is rotated.
The basement is with manual travel device, the rollers are adjusted by bolt shift. We use the floor plug for the machine, due to the long distance of blasting area. After the rotator move to the position, connect the power to the nearest plug on the floor, to avoid use too much cables.
 
 
  • It is composed by one power unit, one idler unit , travel basement and control system. The slot is deigned on the rollers to fit the flange, to avoid painting damage when tower is rotated.

  • The basement is with manual travel device, the rollers are adjusted by bolt shift. We use the floor plug for the machine, due to the long distance of blasting area. After the rotator move to the position, connect the power to the nearest plug on the floor, to avoid use too much cables.

Product Tags: welding rotator move-on-rails   tower painting welding rotator   move-on-rails wind tower production line  
Related Products
Email to this supplier
 
From:
Enter your Email please.
To: Wuxi Octetally Tech Co., Ltd
Subject:
Message:
Characters Remaining: (80/3000)