Turnkey Pre engineered Steel Structure Building Solution
|
Steel Structure Features: Steel has a high strength-to-weight ratio, which is very strong for its weight, and is much higher than other common construction materials, such as concrete and wood. This means that steel components can be made very lightweight without sacrificing strength. Ductile steel structures can absorb more energy before failure than brittle structures. This makes them ideal for applications subjected to high-impact loads, such as in earthquake-prone areas or industrial settings.
Processing Steps of Prefabricated Steel Structure Buildings: Planning and Design Prefabricated steel buildings starts with a detailed planning and design phase. During this stage, the project’s requirements are identified, and the building’s specifications are established. Factors such as size, layout, and intended usage are considered to ensure that the final design meets the client’s needs. The planning phase also includes obtaining necessary permits and approvals, as local regulations may impact the building’s design.
Fabrication in the workshop Once the design is finalized, the components are manufactured in a factory. The use of advanced technology in the manufacturing process ensures that the components are of high quality and precisely engineered for quick assembly. On-Site Assembly After the prefabricated components are transported to the site, the assembly process begins. Since the parts are pre-engineered, they fit together seamlessly, making the installation process much faster than traditional construction methods. A skilled team of workers assembles the steel frame, attaches the wall panels, and installs the roofing system. Depending on the size and complexity of the building, the assembly process can take anywhere from a few days to a few weeks. Steel Structure Building Installation steps: 1.Foundation construction (pre-embedded anchor bolts), Installing detailed drawing will be offered in advance. 2. Column installation One worker commands truck crane how to move, 3 ~ 4 workers cooperate with crane to install the steel column, put column to anchor bolt location. 3.Beam installation After completing the installation of adjacent two steel column, then main beam begin to install. 4.Installing roof & wall purlin The roof and wall purlin will be installed after finishing column and beam. Bolting the purlin on the main structure. 5.Fixing wall and roof sheet To fix the wall sheet on wall purlin by self-tapping screw; then fix the roof sheet. 6.Fixing the cover To install the cover on the corner, eave, window and door opening. 7.Install windows and doors. KXD Install Service: We will offer detailed drawings to guide your installing process. Meanwhile, we still offer free technical questions solve in time. And further we offer different plans to choose for different demands. On-line technical guide in time; 1-2 engineers to guide on site; Our installing team process all assemble for the client. |
||||||||||||||||
Product Tags: Turnkey steel structure building prefabricated steel structure building solution Pre-engineered steel structure building |
![]() |
Prefab Steel Structure Workshop Kits for Farm Storage & Industrial Use |
![]() |
Metal Building Prefabricated Steel Shed Steel Structure Workshop Warehouse Building |
![]() |
Metal Building Prefabricated Steel Shed Steel Structure Workshop Warehouse Building |
![]() |
DIY Steel Storage Kit for Backyard Metal Building and Garden Shed |
![]() |
Prefab Steel Structure Building for Hay Storage - Clear Span Framing |
![]() |
Light Steel Structure Indoor Horse Riding Arena Hall Kits with Free Design |