Stone Column Pile Driving Vibroflot Equipment 75kw 426mm
|
BVEM Professional Vibroflotation Equipment Stone Column Pile Driving Machine 75kW 426mm
BVEM | CaoDian Rubber Dam project vibro-replacement stone column construction on north canal XiangHe period
This vibro-replacement stone column construction is carrying out by BVEM. The measured buried depth of the stable groundwater level in the engineering area is 2.00 ~ 5.90m. After testing, the environmental water has sulfate type weak corrosivity to concrete. The whole geology is Sandy. The lithology of the stratum is mainly sandy loam and sand. Bottom layer is four layers of medium fine sand liquefaction layer. The foundation treatment depth is required to be within 1m below the bottom of liquefaction layer. The project adopts equilateral triangle pile arrangement, with pile diameter of 0.8m, pile depth of 15m, sheet pile spacing at the bottom of rubber dam of 2.5m, and retaining wall pile spacing on both banks of 2.0m. The filling amount per linear meter of pile body shall not be less than 0.7m3, and the construction period of vibro replacement stone column is 38500m, with a total construction period of 30 days. At present, six units of BVEM 75kW vibroflot devices are working in this project at the same time.
|
|||||||||||||||||||||||||||||||||||||||||||||
Product Tags: 75kw vibroflot equipment 426mm vibroflot equipment Stone Column Pile Driving Vibroflot |
![]() |
Sand Compaction 180kw Vibroflotation Equipment Driver Improving Bearing Capacity |
![]() |
Big Power 180-260 Kw Vibroflotation Equipment Bvem For Soil Improvement |
![]() |
Technique Vibroflotation Equipment Pile Driver Sand Compaction Stone Column Machine |
![]() |
Bvem 180 Kw Vibroflot Vc And Vr Stone Column Sand Compaction Soil Improvement |
![]() |
Pile Driver Vibroflotation Strengthen Foundation Vibroflot Equipment Of Shear Capacity 260kw |
![]() |
75kw 426mm Vibroflotation Equipment In Ground Improvement |