China Steel Structure manufacturer
Qingdao Xinguangzheng Global Engineering Co.,Ltd
make customers happier, let the enterprise more lasting
3
Home > Products > Steel Structure Building >

Prefabricated Commercial Metal Frame Warehouse With Solar Panel

Browse Categories

Qingdao Xinguangzheng Global Engineering Co.,Ltd

City: qingdao

Province/State:shandong

Country/Region:china

Tel:86

View Contact Details

Prefabricated Commercial Metal Frame Warehouse With Solar Panel

Detailed Product Description

ENTERPRISE MISSION: GIVE CLIENTS HAPPINES! Our company, Xinguangzheng (XGZ) Group, has six factories, a production area of 150,000 square meters, 16 million dollars in registered capital and a yearly production capacity 50,000 tons. Design - model - procurement - production - packaging -...

ENTERPRISE MISSION: GIVE CLIENTS HAPPINES!

Our company, Xinguangzheng (XGZ) Group, has six factories, a production area of 150,000 square meters, 16 million dollars in registered capital and a yearly production capacity 50,000 tons. Design - model - procurement - production - packaging - delivery - erection - after-sales for steel structure products will be supplied for you in one-stop service.

 

Brand nameXGZ
Place of OriginQingdao, China
Frame gradeQ355/Q235B/ASTM ETC.
Surface treatmentPaint/Hot dip galvanization
Products

Steel frame/crane/roof and wall panel/insulation/ window/door/skylight/

ventilation/ceiling/solar panel/Louver/Mezzanine/

curtain wall ETC. and Customized products

Delivery time20-60 days after shop drawing confirmed
Guarantee period5 years
Service life50 years
MOQ1,000 square meter

 


Fixed packing, loading, transportation, unloading precautions:

 

(1) Lifting large must be responsible for the use of the appropriate fixture, strictly abide by the lifting rules, to prevent vibration, impact, deformation or damage, fall and other situations in the lifting process.

 

(2) When loading the car, there must be special supervision, check the car number and packaging, pile the car firmly, and increase the necessary binding components loose, to prevent loss.

 

(3) Maintain stability in the transportation process. Trained pilots and escorts must be responsible for the transportation of long, wide and high objects when the vehicle is in transportation, and signs must be arranged on the vehicle.

 

(4) Rough handling is strictly prohibited. Loading and unloading personnel should be familiar with the weight and size of each component, and check the harness and rigging of the horse to prevent accidents.

 

(5) Members shall arrive at the construction site and organize the unloading and stacking areas in time.

 

(6) When crawler crane is carrying components, attention should be paid to the surrounding terrain and air conditioning conditions to prevent the overturning of crawler crane and component collision.


Welcome your inquiry!





Related Products
Email to this supplier
 
From:
Enter your Email please.
To: Qingdao Xinguangzheng Global Engineering Co.,Ltd
Subject:
Message:
Characters Remaining: (80/3000)