Warehouse Management System | Material management | Transform the unique code for new incoming material, add to the total material table |
| Tower setup | Set up new SMD tower and its locations |
| Supplier info | Supplier info management, add, delete or search |
| Customer Info | Customer info management, add, delete or search |
Inventory management | Intelligent management of overall inventory |
| Inventory freeze | Freeze specific locations |
Inventory verification | Take stock and update the data of stored reels |
Scan the code and load | Scan the reel code and put into location |
SMD Tower database | Location parameter table | Record the coordinate and size info of each location |
Current SMD tower table | Record the status of each location of the current SMD tower |
| In & out record | Record all records of material bin and material tray for traceability |
| Operation record | Record initialization, power on and off, alarm and other operations |
Material bin function | Initialization | Initialize when the machine power on |
| Single reel in | Put the reel on the designated position, load it in the tower after scanning code |
| Single reel out | Search for the specified reel, send it out |
| Batch loading | Load the reels into the tower in batches automatically |
Place production orders | According to the production demand, upload the P/N or unique ID to the system for analysis, then lock the reels, and inform each SMD tower to unload |
| Unload to order | After receiving the production order of the system, unload the reels in batches |
| Lock expired reels | Lock the expired reels, prevent them from entering the production process |