120m Length Latex Mattress Production Line 112pcs Mattress / 10 Hours Capacity
|
|
120m lenth Latex Mattress Production line Injection Molding Stage 3: Post-Processing - The Challenge 1. Demolding Option A (Large Sink): Manual scrubbing and spraying in a large sink, or using a specialized, large-scale washing machine. Option B (Inline Spraying): Mattresses are repeatedly rinsed on a conveyor belt through a multi-directional, powerful spray system. Dehydration: A specialized, large-scale roller-type dehydrator or centrifuge is used to extract the bulk of the water from the mattress in stages and sections. 3. Drying This is one of the most time-consuming steps in the production process. The cleaned, wet mattress is fed into a specialized, large tunnel dryer or drying room. The dryer's powerful hot air circulation system ensures that every part of the mattress, especially the center, is thoroughly dried. Time Required: Depending on the thickness, drying a single mattress can take several hours or even more than ten. Humidity and temperature must be precisely controlled to prevent internal mold or surface cracking.
120m Length Latex mattress production line Basic Data:
Conveyor length: (60m*2=120m) Vulcanizing Chamber length: 36m Injection length: 8m Vulcanizing time is 45-55mins The conveyor speed is 0.6m/min Drying time: about 10 hours Mattress mould injection time: about 2min one mould Foam gel and forming time: about 4min Capacity: 112pcs mattress/10 hours |
| Product Tags: Latex Mattress Production line 120m Length Mattress Production line 120m Length mattress production machine |
|
300kg/H Output Capacity Latex Foam Machine Foam Manufacturing Equipment 3.75KW |
|
1200kg/H Output Capacity Latex Foam Machine Foam Making Machine Automated |
|
500KG/H Output Capacity Latex Foam Machine 3.75KW Motor High Performance |
|
80m Length Latex Mattress Production Line With 0.6m/Min Conveyor Speed |
|
120m Length Latex Mattress Production Line 112pcs Mattress / 10 Hours Capacity |
|
High Efficiency 120m Length Latex Pillow Production Line 1000-1200pcs Pillows / 10hours |
