High Efficiency 120m Length Latex Pillow Production Line 1000-1200pcs Pillows / 10hours
|
|
120m length Latex Pillow Production line Latex pillows are primarily produced using the Dunlop process, with a few high-end products utilizing the Talalay process. The key difference between the two lies in their foaming and shaping methods. Below, I will use the mainstream Dunlop process as an example to provide a detailed description of the production line process. The entire production line can be divided into the following core steps: --- Latex Pillow Production Line Process (Dunlop Process) Phase 1: Raw Material Preparation and Pretreatment 1. Raw Material Receiving and Inspection Second Stage: Foaming and Molding 1. Foaming 2. Mold Preparation
120m latex pillow production line Basic Data:
Conveyor length: 120m in total Vulcanizing Chamber length: 45m Vulcanizing time is 40mins The conveyor speed is 2.2m/min Capacity: 1000-1200pcs pillows/10hours Installation size: 60m(L)*8m(W) Motor power: 50kw |
| Product Tags: 120m Length Pillow Production Line High Efficiency Pillow Production Line High Efficiency pillow production machine |
|
300kg/H Output Capacity Latex Foam Machine Foam Manufacturing Equipment 3.75KW |
|
1200kg/H Output Capacity Latex Foam Machine Foam Making Machine Automated |
|
500KG/H Output Capacity Latex Foam Machine 3.75KW Motor High Performance |
|
80m Length Latex Mattress Production Line With 0.6m/Min Conveyor Speed |
|
120m Length Latex Mattress Production Line 112pcs Mattress / 10 Hours Capacity |
|
High Efficiency 120m Length Latex Pillow Production Line 1000-1200pcs Pillows / 10hours |
