China Steel Framed Buildings manufacturer
Changzhou Feiang Technology Co., Ltd
1
Home > Products > Steel Prefabricated Building >

Rapid Assembly Steel Pre Fabricated Buildings Thermal Sound Insulation Steel Frame Modular Buildings

Browse Categories

Changzhou Feiang Technology Co., Ltd

City: hangzhou

Province/State:zhejiang

Country/Region:china

Tel:86---151 9252 5631

Contact Person:
Mr.bruce
View Contact Details

Rapid Assembly Steel Pre Fabricated Buildings Thermal Sound Insulation Steel Frame Modular Buildings

Supply Ability 20000 tons per month
Name Steel Pre Fabricated Buildings
Payment Terms T/T, L/C, Western Union, MoneyGram
Structuretype Prefabricated Modular
Foundationtype Concrete Slab Or Pile Foundation
Dimensions Customizable Length, Width, And Height
Insulation Thermal And Sound Insulation Options Available
Packaging Details Steel pallet
Delivery Time 25-55 days
Roofmaterial Steel Panels With Insulation
Minimum Order Quantity 100 square meters
Place of Origin china
Certification CE,ISO9001
Usage Warehouses, Factories, Offices, Residential Buildings
Framematerial Cold-formed Steel Or Hot-rolled Steel
Assemblytime Rapid Assembly, Typically Within Days
Price USD 25-100 per square meter/Negotiable
Detailed Product Description

Product Overview

This rapid-assembly steel prefabricated building delivers thermal and sound insulation for large-scale factory and warehouse applications. The prefabricated modular structure with cold-formed or hot-rolled steel frame is engineered for large column-free spaces, creating comfortable, energy-efficient environments for large production facilities. Fast assembly and customizable dimensions make it the ideal large-scale steel building solution.

Specifications

NameSteel Pre Fabricated Buildings
StructuretypePrefabricated Modular
FoundationtypeConcrete Slab Or Pile Foundation
InsulationThermal And Sound Insulation Options Available
DimensionsCustomizable Length, Width, And Height
UsageWarehouses, Factories, Offices, Residential Buildings
FramematerialCold-formed Steel Or Hot-rolled Steel
AssemblytimeRapid Assembly, Typically Within Days
RoofmaterialSteel Panels With Insulation
Payment TermsT/T, L/C, Western Union, MoneyGram
Supply Ability20000 tons per month
Delivery Time25-55 days
PriceUSD 25-100 per square meter/Negotiable
Packaging DetailsSteel pallet
Minimum Order Quantity100 square meters
Place of Originchina
CertificationCE,ISO9001

Application Scenarios

Large factories · Insulated warehouses · Production workshops · Industrial buildings · Energy-efficient facilities

Key Advantages

  • Thermal and sound insulation for comfortable large halls
  • Rapid assembly of prefabricated modular components
  • Large-span steel frame for column-free factory floors
  • Customizable length, width, and height
  • Proven for warehouses, factories, offices, and residential use

FAQ

Q: What is the maximum span for this large-scale steel building?

A: The building can be designed with large-span steel frames to create column-free interior spaces. Please contact our engineers with your required span, and we will provide a customized structural design.

Q: Can the dimensions be customized for my factory project?

A: Yes, the length, width, and height are fully customizable. Our engineering team will design the building according to your site conditions and production requirements.

Q: How long does assembly take for a large factory building?

A: Thanks to the prefabricated modular system, assembly typically takes days to weeks depending on the building size, significantly faster than traditional construction.

Product Tags: Rapid Assembly Steel Pre Fabricated Buildings   Thermal Insulation Steel Frame Modular Buildings   Sound Insulation Steel Frame Modular Buildings  
Related Products
Email to this supplier
 
From:
Enter your Email please.
To: Changzhou Feiang Technology Co., Ltd
Subject:
Message:
Characters Remaining: (80/3000)