Quality Control
1. Tools & Equipment
Calipers, micrometers, height gauges
Surface roughness tester
Optical comparator/CMM (Coordinate Measuring Machine)
Hardness tester (Rockwell/Vickers)
Go/No-Go gauges
Visual inspection tools (magnifying glass, LED light)
Salt spray tester (for corrosion resistance, if applicable)
Material certification verification (e.g., chemical composition reports)


2. Inspection Steps
2.1 Incoming Material Check
Verify material certification (grade, thickness, hardness) matches the purchase order.
Inspect raw material for surface defects (scratches, rust, dents).
2.2 First Article Inspection (FAI)
Inspect the first batch of stamped parts after tool setup.
Use CMM or optical comparator to validate critical dimensions against CAD drawings.
Check for burrs, cracks, or deformation using visual inspection.
Confirm proper functionality (e.g., fit with mating parts).
2.3 In-Process Inspection
Frequency: Every 1-2 hours or per production lot (define based on risk).
Key Checks:
Dimensional accuracy (e.g., hole diameter, flange length).
Surface finish (free of scratches, dings, or tool marks).
Burr height (must not exceed 0.1mm unless specified).
Hardness testing (if heat-treated).
Record results in inspection reports.
2.4 Final Inspection
100% Inspection (for critical parts) or AQL Sampling (e.g., Level II per ISO 2859-1).
Checklist:
Conformance to engineering drawings (all dimensions).
Functional testing (e.g., assembly trial, springback verification).
Cosmetic standards (no visible defects in Class A surfaces).
Packaging integrity (no damage during handling).
2.5 Non-Conformance Handling
Tag and isolate defective parts.
Document defects (photos, measurements) for root cause analysis.
Initiate corrective actions (e.g., tool adjustment, process review).

3. Acceptance Criteria
Dimensions: Within ±0.05mm tolerance (or as per drawing).
Surface defects: No cracks, wrinkles, or tears.
Material properties: Hardness, thickness, and coating (if any) meet specifications.

4. Documentation
Records:
First Article Inspection Report (FAIR)
In-process inspection logs
Final Inspection Certificate
Material Test Certificates (MTCs)
Sign-off: Approved by QA Supervisor before release.

5. Continuous Improvement
Review inspection data monthly to identify trends (e.g., recurring defects).
Update tooling or processes as needed to enhance quality.


Certifications
|
|
|
|
|
|
|
|
|
|
|
|
Certifications
Cangzhou Futong Precision Manufacturing Co.,Ltd
Tel:86-10-8733-8783
Fax:86
Contact Person: Mr.Abram Dong
Other Products
|
39x12.5x11cm Black Under Desk Wire Cable Basket | Wall Mount Cable Organizer for Office & Garage |
|
No Drilling Under Desk Extendable Desk Cable Organizer with Clamp for Home Office |
|
4x4 Wood Post Pergola Bracket Kit – 3-Way Slanted Support for Pergola & Gazebo |
|
Heavy Duty Heavy Duty 4x4 Pergola Bracket Kit – 3-Way Slanted Outdoor Pergola Connector4x4 Pergola Bracket Kit – 3-Way Slanted Outdoor Pergola Connector |
|
Outdoor Pergola Hardware Kit – 4x4 Inch 3-Way Slanted Metal Brackets |
Email to this supplier








