China Power Supply Test System manufacturer
Dongguan Chuangrui New Energy Co., Ltd
Value quality, maintain integrity, let products reassure customers, and satisfy customers with services
1
Home > Products > Power Supply Test System >

ATE Charger Adapter Test System Power Supply Automation Test System Ate Tester

Browse Categories

Dongguan Chuangrui New Energy Co., Ltd

City: dongguan

Province/State:guangdong

Country/Region:china

Tel:86--13018677119

Contact Person:
Mr.Zou Weimin
View Contact Details

ATE Charger Adapter Test System Power Supply Automation Test System Ate Tester

Brand Name Topfer
Model Number Top-Smart 1100
Place of Origin China
Minimum Order Quantity one set
Price to be discussed
Payment Terms T/T
Supply Ability 10 sets /30 days
Delivery Time 2 to 3 weeks
Packaging Details wooden crate
Color gray
simultaneously measurable 4-16 power supply products
Altitude 1.7m
Customizable Yes
Product Usage Automatic Testing for Adapter Products
Function Rapidly test the performance of various power supply products.
Detailed Product Description

ATE charger adapter test system, power supply automation test system, direct sales from the manufacturer, ate tester

 

1. High degree of automation enhances testing efficiency


Automatically execute the test process: Through preset programs, automatically complete tests on input/output characteristics, protection functions, energy efficiency, etc., reducing manual operation time.

Multi-channel parallel testing: Supports simultaneous testing of multiple power supply samples, significantly shortening the batch testing cycle (such as full inspection of fast charging power sources on the production line).

7× 24-hour continuous operation: Suitable for scenarios such as aging tests and life tests, no manual intervention is required.


2. High testing accuracy and traceable data


Accurately measure key parameters:

Voltage/current accuracy: Up to 0.1% range accuracy (such as output from a 5V/1A adapter).

Ripple noise: Resolution up to 1mVpp (oscilloscope-level measurement).

Energy efficiency test: The error of the power analyzer is <0.5% (meeting the DoE/ Energy Star standard).

Eliminate human errors: Automate data collection to avoid deviations from manual reading or recording.

Data storage and traceability: Test results are automatically generated into Excel/PDF reports, supporting barcode scanning to associate sample information.


3. Cover all test items


Basic performance test:

Input voltage range (such as 90V to 264VAC), inrush current, no-load power consumption.

Output voltage/current stability, load regulation rate, dynamic response.

Verification of protection function

The protection mechanisms such as overvoltage (OVP), overcurrent (OCP), short circuit (SCP), and over-temperature (OTP) are triggered for testing.

Environmental adaptability test

Simulation of extreme conditions such as high and low temperatures (-40℃ to +85℃), humidity and heat (95% RH), vibration/shock, etc.

Special scenario testing

Fast charging protocol compatibility (PD3.0/QC4.0/PPS), audio noise, electromagnetic compatibility (EMC), etc.

 

4. Safety and reliability guarantee


Isolation Design and Protection

The high-voltage test section adopts electrical isolation to avoid operational risks (such as leakage current <1mA during withstand voltage testing).

The output is automatically cut off during short-circuit/overload testing to protect the equipment and samples.

Abnormal alarm and log

Real-time monitoring of the test status, over-limit alarm and recording of abnormal events (such as excessively high temperature and sudden voltage changes).

Long-term stability

It is suitable for aging tests (such as 1000 hours of full-load operation) to expose potential faults in advance.

 

Test itemsComprehensive Test items
CEC testShort circuit test
DC Current under C.V.ModeShort circuit current
Peak-Peak noiseOV protection
Serial reaction time testUV protection
Transient response timeOL protection
Transient spikeOP protection
TrackingIn-test adjustment test
Voltage regulationAC cycle drop out
Current regulationPLD simulation
Turn ON timeDC output current test
Rise timeDC output voltage test
Fall timeWaveform read test
Hold-up timeInput impulse current test
Inrush current testInput power
Power good signalRelay control
Power fail signalBar code scan
P/S ON signalDynamic test
Power up sequenceSpecification under C.P.Mode
Power off sequenceInput Peak current
Effciency testAdditional expansion measurement test
Overall stability testInput RMS current
Fan Speed testTTL signal control
Input power factorLAN read/write
Input voltage rampRS485 read/write
Input freq. rampUSB read/write
Extend the measurement test232 read/write
Automatic testGPIB read/write

 

Product Tags: Power Supply Automation Test System   Ate Power Supply Test System   ATE Charger Adapter Test System  
Related Products
Email to this supplier
 
From:
Enter your Email please.
To: Dongguan Chuangrui New Energy Co., Ltd
Subject:
Message:
Characters Remaining: (80/3000)