China Excavator Long Reach Boom manufacturer
Jiangmen Kaiping Zhonghe Machinery Manufacturing Co., Ltd
Expertise You Can Trust, Service You Deserve. We adhere to that quality fosters long-term relationships with clients. Quality and honesty are cornerstones of a strong reputation.
2
Home > Products > Excavator Pile Driving Arm >

40-50ton Excavator Vibratory Hammer Hydraulic Pile Hammer Arm Pile Driving Arm Sheet Pile Driver Construction Works

40-50ton Excavator Vibratory Hammer Hydraulic Pile Hammer Arm Pile Driving Arm Sheet Pile Driver Construction Works

Brand Name Zhonghe
Model Number DZB001
Certification CE
Place of Origin Guangdong, China
Minimum Order Quantity 1 piece
Price $11000/pieces
Payment Terms T/T
Supply Ability 5 Piece/Pieces per Month
Delivery Time 25-30 work day
Packaging Details Bubble bag packaging
Part name Excavator Pile Driving Arm
Material Q355B/Q690D
Applicable Industries Energy & Mining & Demolition
Suitable excavator 40-50Ton
Length (m) 15-15.8m
Color as customer requires
Warranty 6 Months
Condition 100%new
Quality High-Quality
MOQ 1 PCS
Packing Standard Packing
After-sales service provided Online Video support
Detailed Product Description

 

Product Name
Pile driving boom arm
Material
Q355B/Q690D
Suitable excavator
40-50ton
Colors
Yellow/Red/Orange/Customizable
Length
15-15.8m
Pile driving arms are widely used in municipal engineering, three water(domestic sewage, industrial wastewater, rainwater) diversion engineering, subway, road and bridge projects.

Advantages of excavator pile driving boom arm / Pile Machines

The angle between boom and horizon can reach 88°,The angle between boom and arm can reach 160°

1. Comparing with the same length pile driving arm, ours can pile higher.

2. Adopt 90 degree elbow joint to avoid hose bending and increase it service life

3. The box has built-in transverse and vertical reinforcement ribs to improve pile driving boom tensile strength

4. Seamless precision steel pipe

5. Centralized lubrication system

6. three layers with four passes welding

7. The boom seat sleeve adopts all in one molding process

8. Graphite alloy copper sleeve

9. Hydraulic pipelines section design, convenient for later maintenance

10. Multi-layer reinforcing rib plate at the stress place, more firm, integrated molding

11. The back bushing of the pile arm is wrapped by the whole board to avoid falling off

Some pictures of pile driving boom arm

  

 

 

Quality Control

Post-welding Testing
Accuracy Testing
Weld bead testing
Testing before send out goods
Operation Testing


The first system is the technical design drawing review mechanism
The second system is the semi-finished product review mechanism,(each process has a detection testing for the previous process)

The third system is the finished product testing.
(Before painting, the overall inspection is carried out to check whether the design size matches the welding size, and whether theinstallation size meets the design requirement.)
To sum up, every single ZHONGHE product has been passed the above three-stage inspection system to ensure that is qualified before shipping.

 

 
Product Tags: 40-50ton excavator vibratory hammer   hydraulic pile hammer arm   sheet pile driver construction  
Related Products
Email to this supplier
 
From:
Enter your Email please.
To: Jiangmen Kaiping Zhonghe Machinery Manufacturing Co., Ltd
Subject:
Message:
Characters Remaining: (80/3000)