China Steel Structure Building manufacturer
Qingdao KXD Steel Structure Co., Ltd
TO BE THE FIRST CLASS STEEL BUILDING FABRICATOR
2
Home > Products > Steel Structure Building >

Factory Directly Supplying Wide Applicating Prefab Steel Structure Frame Buildings

Browse Categories

Qingdao KXD Steel Structure Co., Ltd

City: qingdao

Province/State:shandong

Country/Region:china

Tel:86-156-5310-0953

Contact Person:
Mr.David
View Contact Details

Factory Directly Supplying Wide Applicating Prefab Steel Structure Frame Buildings

Brand Name KXD
Model Number KXD-SW22
Certification ISO9001:2008
Place of Origin China Qingdao
Minimum Order Quantity 200 square meters
Price USD 40-85 Per Square meter
Payment Terms T/T, L/C
Supply Ability 5000-9000 tons Per Month
Delivery Time 35-55 days
Packaging Details steel pallet & wooden box or in bulk
Profile Hot rolled H steel / Weld H steel
Material Q355b, Q235b
Technician Free technical support
Design Custom exactly as the demands
Drawing 3D model and installing drawing available
Production Finished for direct install support
Coating Alkyd painting, Epoxy painting, Hot dip galvanized
Insulation EPS, Glasswool, Rockwool, PU on option
Standard Different standards on option as demands
Install Online guide support & On-site install
Service life 30-50 years
Visit Workshop visit and check available
Detailed Product Description

Factory Directly Supplying Wide Applicating Prefab Steel Structure Frame Buildings

 

 

 

 

Five commonly used assembly methods for steel structural components:

 

1. Ground sampling method

Assembly method: Use a ratio of 1:1 to put the actual components on the assembly platform. Then, according to the position of the parts on the actual sample, they are assembled into components.

Use range:

Small batch structure assembly, such as trusses and frames

 

2, Copy and assembly method

Assembly method: First assemble into a single-sided (single piece) structure by ground pattern method. And the spot welded is necessary. Then turn over as a duplicate tire mold, assemble another single-sided structure on it, and assemble twice.

Use range:

Truss structure with symmetrical cross sections

 

3, Stand up method

Assembly method: Choose top-down or bottom-up assembly according to the characteristics of the component and the stable position of the parts.

Use range

Used to configure a stable, low-height structure or large diameter cylinder

 

4, Lying down method

Assembly method: assembly on the position where the component is placed.

Use range:

Used for slender members with small cross-section but large length

 

5. Fetal membrane assembly method

Assembly method: the assembly of the parts of the component with the tire mold positioned at its assembly position.

Use range:

Used to manufacture products with large batches of components and high precision

 


 

Main componentsBaseCement and steel foundation bolts
 Main frameH-section steel
 MaterialQ235B, Q345B or others as buyers' requests.
 PurlinC / Z Steel: Size from C120~C320, Z100~Z20
 BracingX-type or other type bracing made from angle, round pipe
 BoltPlain bolt and High-strength bolt
 Roof & wallSandwich panel or Single steel sheet
 DoorSliding door / Rolling door / Securing door
 WindowAluminium alloy frame
 SurfaceTotal four layers of Anti-rust Painting or Galvanized

 

Steel Frame Installation

---Steel column installation

The steel column should be lifted by one-point straight lifting lashing method. When in place, align the anchor bolts and slowly drop. After alignment, screw on the nut to temporarily fix the column, correct its plane position and verticality. After the correction, finally screw the nut and use the backing plate is welded firmly to the column bottom plate. Then the column bottom is grouted and fixed.

 

---Steel crane beam installation

The crane beam is lashed at two points, and when hoisting, the aerial posture of the components during the hoisting process is controlled by a sliding rope to facilitate alignment and avoid collisions. After being temporarily fixed in place, the verticality, elevation, and vertical and horizontal axis positions of the crane beam should be corrected.

 

---Roof system installation

The roof truss installation should be carried out after the columns are calibrated and fixed. The roof system can be hoisted after the expansion assembly assembly, and the expansion assembly assembly unit should become a spatial structure with certain rigidity. The installation of purlins and other components should be carried out after the roof truss is adjusted and positioned.

Related Products
Email to this supplier
 
From:
Enter your Email please.
To: Qingdao KXD Steel Structure Co., Ltd
Subject:
Message:
Characters Remaining: (80/3000)