China High Temperature Box Furnace manufacturer
Hefei Chitherm Equipment Co., Ltd
2
Home > Products > Elevator Furnace >

Model BF216-11 Bell Furnace for Debinding and Sintering Processes of Low Temperature Co-fired Ceramics (LTCC)

Browse Categories

Hefei Chitherm Equipment Co., Ltd

City: hefei

Province/State:anhui

Country/Region:china

Tel:86-0551-62576378

Contact Person:
Mr.zang
View Contact Details

Model BF216-11 Bell Furnace for Debinding and Sintering Processes of Low Temperature Co-fired Ceramics (LTCC)

Brand Name Chitherm
Model Number Bf216-11
Place of Origin China
Minimum Order Quantity 1
Price 86000-86361
Payment Terms L/C,T/T
Supply Ability 50 Sets/Year
Packaging Details Wooden Package
Model NO. Bf216-11
Range of Applications Industrial
Type Electric Holding Furnace
Usage Ceramic Sintering
Fuel Electric
Detailed Product Description
Model BF216-11 Bell Furnace for Debinding and Sintering Processes of Low Temperature Co-fired Ceramics (LTCC)
Model BF216-11 Bell Furnace is mainly used for debinding and sintering of Low Temperature Co-fired Ceramics (LTCC), and can also be widely applied to the sintering of other related electronic products.
Product Specifications
Model NO.Bf216-11
Range of ApplicationsIndustrial
TypeElectric Holding Furnace
UsageCeramic Sintering
FuelElectric
Product Description
Application

This equipment is mainly designed for LTCC sintering, it can also be used for binder burning out and sintering process of other relevant electrical products.

Technical Specification
  1. Rated Temperature: 850ºC
  2. Max. Temperature: 1000ºC
  3. Chamber Dimensions: 600mm×600mm×600mm (D×W×H)
  4. Effective Dimensions: 400mm×400mm×400mm (D×W×H)
  5. Chamber Insulation Material: Aluminosilicate Ceramic Fiber
  6. Heating Elements: Resistance Coils in Ceramic Fiber Block
  7. Thermcouple: Type K
  8. Temperature Control Point: 4 Points
  9. Pre-Heating: 4 Inlets
  10. 3 Stages Pre-Filtering of air: 1- dust, 2 - water drops, 3 - oil vapor
  11. Temperature Control Precision ≤ ±1ºC
  12. Temperature Control Mode: Temperature controller imported from Japan
  13. Heating-up Steps: Default 20 Steps
  14. Temperature Record: IPC makes a real-time sampling record of the chamber temperature and the gas heating temperature
  15. Heat-up Rate ≤6ºC/min
  16. Chamber Temperature Uniformity: 400mm×400mm×400mm (D×W×H) area is better than ± 3ºC
  17. Furnace Surface Temperature ≤ RT+35ºC
  18. Lift System: the equipment lifting operation system adopts three-point control, automated hearth extension, which can be stopped at any time, with stable and reliable operation
  19. Maximum Lifting Trip: 800mm
  20. Loading Weight ≤ 150Kg (including products and setters)
  21. Total Power: 52kW (Max Heating Power: 40kW, Max Gas Preheating Power: 4×3kW)
  22. Outline Dimensions: 1520×1520×2250mm (D×W×H)
  23. Weight: about 1000kg
Shipping List
ItemDescriptionQty
Basic ComponentsFurnace1SET
Inspection CertificateCertificate of major outsourced components1SET
Technical DocumentsInstructions, technical documents of the major outsourced parts, etc1SET
Key ComponentsHeating Elements | Resistance Coils Heating Plate1SET
FlowmeterAzbil/Dwyer/TOFCO/YINHUAN1SET
Differential PressureDwyer/TOFCO/DUWEI1SET
ThermocoupleWatlow/THERMOWAY1SET
Lifting SystemCustomized1SET
Temp. ControllerAzbil1SET
PLCSIEMENS1SET
Touch ScreenMCGS (based on Linux)1SET
Spare PartsSolid State Relay | XIMADEN1PC
Heating ElementsResistance Coils Heating Plate1 PC
Facility Requirements
  1. Atmosphere Conditions: dry, clean, oil-free compressed air, working pressure of 0.2-0.4MPa, gas consumption of 25-70 m3/h
  2. Environmental Conditions: temperature: 0~40ºC, humidity≤80%RH, no corrosive gas, no strong airflow disturbance
  3. Ventilation System: non-contact access to the user pumping system, pumping capacity is greater than 100 m3/h
  4. Ground Requirements: horizontal, no obvious vibration, load-bearing>500 kg/m2
  5. Power: capacity> 70KVA, 3-phases 5-lines, voltage 220 / 380V, frequency 50Hz. Fire line: yellow, green, red, Zero line: blue, Ground line: yellow-green
  6. Installation Site: 3500mm×3000mm×3000mm (D×W×H), with an installation area greater than 11m2
Company Profile

Hefei Chitherm Equipment Co., Ltd. is an advanced equipment supplier specializing in the research and development, design, manufacturing, sales, maintenance, and service of high-, medium-, and low-temperature industrial furnaces and laboratory furnaces. Its product range encompasses bell furnaces, box furnaces, hot air furnaces, vacuum furnaces, tube furnaces, mesh belt furnaces, bogie hearth furnaces, rotary furnaces, roller hearth furnaces, and pusher furnaces, which are extensively applied in fields such as advanced ceramics, electronic components, thick-film circuits, additive manufacturing, powder metallurgy, new energy, and photovoltaics. These furnaces are suitable for thermal treatment processes of materials including ITO targets, MLCC/HTCC/LTCC, ceramic filters, magnetic materials, CIM/MIM, and lithium battery cathodes and anodes, as well as various other new material processes such as pre-sintering, dewaxing, degreasing, sintering, drying, heat treatment, curing, and ceramization.

Frequently Asked Questions
What products does Chitherm offer?

We provide customers with high-quality bell furnaces, hot air furnaces, box furnaces, tube furnaces, vacuum furnaces, car bottom furnaces, rotary kilns, mesh belt furnaces, and pusher furnaces.

What pre-sales services does Chitherm provide?

We offer timely consultation services to help customers select the most suitable products, along with highly customizable solutions to meet your specific requirements.

What are Chitherm's core strengths?

As a high-tech enterprise integrating R&D, manufacturing, and sales, Chitherm possesses patented technologies and core resources to deliver superior solutions.

Related Products
Email to this supplier
 
From:
Enter your Email please.
To: Hefei Chitherm Equipment Co., Ltd
Subject:
Message:
Characters Remaining: (80/3000)