China Steel Structure Workshop manufacturer
China CT Steel Structure Group Co., Ltd.
1
Home > Products > Steel Structure Workshop >

Custom Steel Structure Workshop Prefabricated Industrial Warehouse Building

Custom Steel Structure Workshop Prefabricated Industrial Warehouse Building

Brand Name CT Steel Structure
Model Number Workshop86702
Certification SGS
Place of Origin China
Minimum Order Quantity 200 square meters
Price $40-160 per square meter
Payment Terms L/C,T/T
Supply Ability 200, 000 Tons / Year
Delivery Time 3-5weeks
Packaging Details Single package size: 1200 × 200 × 200 cm
Building Use Prefabricated Workshop Buildings
Purlin C.Z Shape Steel Channel
Stiffness The Overall Stiffess Is Good
Intensity High Intensity
Processing Service Bending, Welding
Raw Steel Material Q235B, Q355B
Design Load Wind, Snow, Seismic
Bracing System Round steel bar, CHS, Angle steel
Detailed Product Description

Prefabricated industrial warehouse building, metal workshop, steel structure building

 

Product Description:

Steel structure building is a new type of production building structure system formed by connecting H-shaped steel, Z-shaped steel, U-shaped steel components, cranes, roofs and walls with the main steel skeleton, and using a variety of panels and other components such as windows, doors, cranes, etc.
It can be widely used in workshops, warehouses, garages, farms, airports, office buildings, apartments, as well as various steel buildings, metal buildings, modular houses, steel frames and other riveted welded parts.

The size can be customized according to your needs.

 

Product nameSteel structure factory
LengthH beam 4000-15000mm
Height200-1200mm
Galvanizing Thickness40 - 100 μm, etc. for Selection.
Main frameH beam
BaseCement and steel fouddation bolts
SpecificationCustom
BoltPlain bolt ang high-strenth bolt
Roof&wall Sandwich panel or color plate
DoorSliding or rolling door
Transport PackageSeaworthy Package
TrademarkQianfeng Chentai Steel Structure
Customized design is welcomed.
In order to give you an exactly quotation and drawings, please let us know the length, width, eave height and local weather.We will quote for you promptly.
Building Purpose: we will recommend the best design for the purpose of the building
A.Warehouse/Storage
B.Industrial workshops
C.Processing plants
D.Greenhouse structure for breeding
E.Medical Warehouse
F.Office buildings
G.Agriculture Barn

Package Size100.00cm * 100.00cm * 100.00cm
Package Gross Weight100.000kg

 

Steel structure factory building
There are many benefits of a steel structure factory. From the point of view of construction speed, the prefabricated component factory and rapid on-site assembly save the long waiting time for wet concrete operation, and the construction period is 1/3 or even more shorter than that of traditional concrete structure factories, so that enterprises can quickly put into production and seize the market one step faster. In terms of space utilization, it can create a large-span column-free space, and an open field of tens or even hundreds of meters is not a problem, which is convenient for large-scale equipment placement and material handling, and greatly improves the space utilization rate.
In terms of structural performance, the steel has high strength and light weight, and when bearing the same load, the component cross-section is small and the self-weight is light, which not only reduces the cost of infrastructure construction, but also gives the factory excellent seismic performance, and effectively guarantees the safety of personnel and equipment when the earthquake comes. From the perspective of environmental protection, after the expiration of the life of the factory, the recycling rate of steel components exceeds 90%, which greatly reduces construction waste and practices the concept of green development.
During construction, the steel structure is limited by the climate, and it is difficult to stop the pace of construction in winter and summer, wind and rain, and the progress of the project is steadily advancing. The design is more flexible and changeable, and it can be shaped according to the production process and the needs of the enterprise. Maintenance is also worry-free, do a good job of surface anti-corrosion, regularly check the coating, long-term maintenance cost is much lower than the traditional building structure.

 

Why Choose Us

China CT Steel Structure Group Co., Ltd. has been established for more than 20 years, with a strong technical background team, advanced machinery and equipment, standardized management system, perfect after-sales service, has accumulated rich experience in design, production and installation, and has the ability to produce bulk orders, no matter what your needs, we will do our best to meet your requirements.

1. High quality, sturdy, durable, stable and fashionable.
2. Professional design team ability
3. Quick and easy installation and installation
4. Cheaper and lower maintenance than any other construction method
5. Longer life than other similar products
6. Eco-friendly, steel and components can be recycled without affecting the environment
7. Uniform quality
8. Economy of transportation and loading and unloading
9. After-sales: professional installation team.

 

Choosing our steel structure storage products is to choose professionalism, quality, efficiency and value. We look forward to working with you to create exceptional construction projects.

 

Looking Forward To Your Inquiry

 

Company Profile

China CT Steel Structure Co.,Ltd of BY GROUP is a comprehensive industrial group integrating for steel structure design, manufacture and installation. We have estabulished over 15 years. Our factory is covering about106,5 60 square meters.

Main products: steel structural warehouse, workshop, high rise steel building, school, hotel,office building, exhibition building, show room, shopping mall, stadium,Agricultural project (stable/cattle barn, poultry house,pig house), car parking, hangar,shed,storage room, prefab house, container house, Sandwich panel,corrugated steel sheet, C&Z sec- tion steel, door and windows and cranes.   

Packing: we pack all the parts on the steel pallet and push into the container when clients received they can pulling them out within half an hour. It can help our clients to save a lot of time and labor cost during unloading.

Container loading; We will supply the materials list, the packing lists based on the contents we loaded into container. Showing the quantity, part no. length, container no, seal no.after finishing the container loading.

"Quality and service first "is our company's development goals. We hope we will develop together and win more projects together!

 

Packaging & Shipping

1. All standard components are packed in plywood box.
2. All steel structure weld components are packed with blanket or bubble-wrap to avoid scratch during loading and unloading.
3. All steel structure are packed in steel pallet together into container, much save loading and unloading time, labor cost.
4. All sandwich panel are packed in steel pallet.
5. Material components will be made container load plan, also make regional unloading plan to avoid retransport on site.
6. All equipment pasted with English lable
7. Small equipment will packed in carton or plywood box

 

FAQ

Product Tags: Custom Steel Structure Workshop   Steel Structure Workshop Prefabricated   Prefabricated Industrial Warehouse Building  
Related Products
Email to this supplier
 
From:
Enter your Email please.
To: China CT Steel Structure Group Co., Ltd.
Subject:
Message:
Characters Remaining: (80/3000)