China Crawler Crane manufacturer
Shandong Tengfei Hoisting Engineering Co., Ltd.
Shandong Tengfei Hoisting Engineering Co., Ltd.
1
Home > Products > Used Crawler Crane >

High Altitude 220T Used Crawler Cranes / 1239t.M Boom Crawler Crane

Browse Categories

Shandong Tengfei Hoisting Engineering Co., Ltd.

City: zibo

Province/State:shandong

Country/Region:china

Tel:86-0533-7975775

Contact Person:
Mr.Gong
View Contact Details

High Altitude 220T Used Crawler Cranes / 1239t.M Boom Crawler Crane

Brand Name XCMG
Model Number XLC220
Place of Origin China
Minimum Order Quantity One Crane
Price Negotiable Price
Payment Terms L/C,T/T
Supply Ability Supply According to Customer Needs
Delivery Time According to Order Confirmation
Packaging Details Packing According to Customer Requirements
Max Lifting Height 93/106.5m
Rated Power 360/1800 kW/r/min
Dimension 9670*3480*3460mm
Crawler Condition 90% New
Boom_Length 84 meters
Engine Rated Power 199 kw
Jib Angle 15,30°
Max_Tip_Height 120 meters
Engine Power 209 KW
Import China
Detailed Product Description

When Facing The Challenges Of High-altitude Operations: 220T Crawler Crane Is The Perfect Solution

XLC220 Crawler Crane Technical Specifications

 

Crawler crane models: XLC220
Max rated lifting capacity: 220t
Max lifting moment: 1239t.m

 

Typical working conditions

 

Main boom working condition_HBS/1_65t+21t main boom main hook performance with arm end pulley auxiliary hook

Operating radius(m)

Main boom length(m)

17

20

23

26

29

32

35

38

41

44

47

50

5

220

 

 

 

 

 

 

 

 

 

 

 

6

196

192

190.5

179

 

 

 

 

 

 

 

 

7

177

176

174.5

170

164

156

144

 

 

 

 

 

8

151

151

147

142

138

134

131

127

115

103

 

 

9

125

125

125

123

119

116

113

111

108

103

101

 

10

105

106

106

106

105

102

100

98.3

96.1

94

91.9

89.9

12

79.8

80.2

80.5

80.6

80.7

80.7

80.7

79.5

77.9

76.4

74.9

73.4

14

63.5

63.9

64.2

64.3

64.4

64.4

64.4

64.3

64.2

63.9

62.8

61.6

16

52.2

52.7

53

53.1

53.2

53.2

53.1

53.1

53

52.9

52.7

52.6

18

 

44.4

44.8

44.9

45

45

44.9

44.8

44.7

44.6

44.5

44.4

20

 

 

38.5

38.6

38.7

38.7

38.7

38.6

38.5

38.4

38.2

38.1

22

 

 

 

33.6

33.8

33.8

33.7

33.6

33.5

33.4

33.3

33.1

24

 

 

 

29.6

29.7

29.7

29.7

29.6

29.5

29.4

29.3

29.1

26

 

 

 

 

26.4

26.4

26.4

26.3

26.2

26.1

25.9

25.8

28

 

 

 

 

 

23.6

23.6

23.5

23.4

23.3

23.2

23

30

 

 

 

 

 

 

21.2

21.1

21.1

20.9

20.8

20.6

32

 

 

 

 

 

 

19.1

19.1

19

18.9

18.7

18.6

34

 

 

 

 

 

 

 

17.3

17.2

17.1

17

16.8

36

 

 

 

 

 

 

 

 

15.6

15.5

15.4

15.2

38

 

 

 

 

 

 

 

 

 

14.1

14

13.8

40

 

 

 

 

 

 

 

 

 

12.8

12.7

12.6

42

 

 

 

 

 

 

 

 

 

 

11.6

11.4

44

 

 

 

 

 

 

 

 

 

 

 

10.4

Magnification

18

18

16

14

13

12

11

10

9

9

8

8

 

Notes:

1.When the main boom length exceeds 71m, a waist rope is required for the combination at the "*" position. When the main boom length exceeds 74m, it is recommended to use an inclined wedge to assist in raising the boom.

2.The tower arm rear pull plate needs to be removed from each boom section, and the tower arm guide pulley needs to be removed from the top section of the main boom.

 

Main boom working condition_HBS/1_65t+21t main boom main hook performance with arm end pulley auxiliary hook

Operating radius(m)

Main boom length(m)

53

56

59

62

65

68

71*

74*

77*

80*

10

85.4

81.5

78.5

68.5

 

 

 

 

 

 

12

72.3

70.9

69.5

66.5

65.5

62.6

60.2

55

 

 

14

60.9

59.8

58.7

57.6

56.5

55.6

54.5

53.5

48.8

44.6

16

52.2

51.3

50.4

49.5

48.7

47.9

47

46.3

45.5

43.3

18

44.5

44.4

44

43.2

42.4

41.8

41

40.5

39.7

39.1

20

38.2

38.1

37.9

37.7

37.4

36.9

36.2

35.7

35

34.5

22

33.2

33.1

32.9

32.7

32.5

32.4

32.1

31.7

31.1

30.7

24

29.2

29.1

28.9

28.7

28.5

28.4

28.1

28.1

27.8

27.4

26

25.9

25.8

25.6

25.4

25.2

25.1

24.8

24.8

24.6

24.4

28

23.1

23

22.8

22.6

22.4

22.3

22

22

21.8

21.6

30

20.8

20.6

20.4

20.2

20

19.9

19.6

19.6

19.4

19.3

32

18.7

18.6

18.4

18.2

17.9

17.9

17.6

17.6

17.3

17.2

34

16.9

16.8

16.6

16.4

16.2

16.1

15.8

15.8

15.5

15.4

36

15.4

15.2

15

14.8

14.6

14.5

14.2

14.2

14

13.8

38

14

13.8

13.6

13.4

13.2

13.1

12.8

12.8

12.6

12.5

40

12.7

12.6

12.4

12.2

12

11.9

11.6

11.6

11.3

11.2

42

11.6

11.4

11.3

11.1

10.8

10.7

10.5

10.5

10.2

10.1

44

10.6

10.4

10.2

10.1

9.8

9.7

9.5

9.5

9.2

9.1

46

9.7

9.5

9.3

9.1

8.9

8.8

8.6

8.5

8.3

8.2

48

 

8.7

8.5

8.3

8.1

8

7.7

7.7

7.5

7.3

50

 

7.9

7.7

7.5

7.3

7.2

7

6.9

6.7

6.6

52

 

 

7

6.8

6.6

6.5

6.2

6.2

6

5.9

54

 

 

 

6.2

5.9

5.9

5.6

5.6

5.3

5.2

56

 

 

 

 

5.3

5.3

5

5

4.7

4.6

58

 

 

 

 

4.8

4.7

4.4

4.4

4.2

4.1

60

 

 

 

 

 

4.2

3.9

3.9

3.7

3.5

62

 

 

 

 

 

 

3.4

3.4

3.2

3.1

64

 

 

 

 

 

 

 

3

2.7

2.6

66

 

 

 

 

 

 

 

2.5

2.3

2.2

Magnification

7

6

6

6

5

5

5

4

4

4

 

Notes:

1.When the main boom length exceeds 71m, a waist rope is required for the combination at the "*" position. When the main boom length exceeds 74m, it is recommended to use an inclined wedge to assist in raising the boom.

2.The tower arm rear pull plate needs to be removed from each boom section, and the tower arm guide pulley needs to be removed from the top section of the main boom.

Product Tags: 220t used crawler cranes   1239t.m boom crawler crane   220t boom crawler crane  
Related Products
Email to this supplier
 
From:
Enter your Email please.
To: Shandong Tengfei Hoisting Engineering Co., Ltd.
Subject:
Message:
Characters Remaining: (80/3000)