Fully Automatic Ultrasonic Cleaning Machine for Aerospace and
Military Industry (Hub Cleaning) Designed specifically for precision military components such as
aerospace engine hubs and missile component hubs, this solution
integrates high-frequency ultrasonic cleaning, intelligent tooling
positioning, and full-process closed-loop control technology. It
addresses complex cleaning challenges posed by contaminants like
oil stains in deep and blind holes, high-temperature oxide layers,
and metal machining debris, meeting aerospace-grade cleanliness and
reliability standards. Suitable for cleaning precision components including aircraft
engine turbine hubs, missile steering gear hubs, and UAV carbon
fiber hubs, it has passed the special certification of "Complex
Surface Component Cleaning Process" by a leading aerospace group.
This helps military manufacturing achieve a technological upgrade
from "qualified cleaning" to "precision cleanliness". Industry-specific customized services for rapid implementation in
production scenarios - Professional process support
- Free sample testing: Customers provide 3 valve body samples, and
a Surface Treatment Inspection Report (including roughness, film thickness, and salt spray test
data) will be issued within 48 hours.
- Customized fixture development: Engineers design exclusive clamping
solutions (such as support structures for thin-walled parts and
anti-blocking devices for threaded holes) based on the 3D drawings
of valve bodies, ensuring no blind spots in the treatment process.
- Full-cycle service guarantee
- 7×24-hour response: Three major technical service centers
nationwide (Yangtze River Delta, Pearl River Delta,
Beijing-Tianjin-Hebei region) stock commonly used vulnerable parts
(electrode plates, temperature controllers, spray nozzles) and can
arrive on-site within 24 hours.
- Operation training system: Provide 3 days of on-site training
(including process principles, equipment operation, and fault
troubleshooting). Upon passing the assessment, an operation
qualification certificate will be issued to ensure that operators
can work independently within 3 days.
|