Cnc Custom Machining Stainless Steel 510 Threaded Atomizer | Products Discription | | Producsts Name | Cnc Custom Machining Stainless Steel 510 Threaded Atomizer | | Production Equipment | CNC machining center (computer gong), 4-axis machining center,
5-axis machining center CNC turning and milling compound
machine, Cnc 5 Axis Machining Center CNC core walking machine, CNC
lathe, | | Material Available for CNC Machining | Stainless steel: SUS303, SUS304, SUS316 | | Surface Treatment after CNC Machining | Grinding, Polish, Deburr, Painting, Galvanization, Chrome Plating,
Anodization treatment etc | | Inspection | Incoming material inspection, first article inspection, patrol
inspection, random inspection, full shipment inspection, quality
assurance. | | Inspection Istrument | Caliper, micrometer, plug gauge, thread gauge, height gauge,
altimeter, lever gauge, quadratic element, projector,
three-dimensional element | | CNC machining parts are widely used in different area | Auto Parts, Hydraulic Hoses, Oil Machinery, Geological Drilling,
MotorCycle, Bycycle, Agricultural Machine Parts, Engineering
Machinary, Fastners. | | Production Process | Raw material incoming inspection→Drawing Confirmation→Machine
Setup→Trial Production→Sample quality check and confirmation→Mass
production→Final Inspection→Packing→Ready to Ship |
Products Display
Cnc Custom Machining is available. Products Appliction
Production Equipment of Cnc Custom Machining
Why choose TORICH?
| 1. Manufacturer, Exporting and Trading for over 20 years'
experiences. | | 2. Good connection with 1st hand manufacturers engineer and
production team directly. | | 3. TOP A raw material supplier for long term and stable
cooperation. | | 4. Experienced engineers in the field for over 20 years. | | 5. 7x24hours prompt reply after receiving 1st enquiry. |
FAQ 1. Are you manufacturer or trader ? TORICH is manufacturer based trading company. 2. How can we get samples ? Ready to ship samples can be delivered within 3 working days,
developing samples need to be confirmed with our engineer and sales
team. 3.What is the lead time? 15-60 day depending on different order quantity and products.
|