China Folding Partition Walls manufacturer
Guangdong Bunge Building Material Industrial Co., Ltd
Movable Partition Walls, Creative Space Solutions Real Manufacturer, Based in China, NO Middle Man 0086 15899953127 WhatsApp/Wechat gzbunge@hotmail.com, gzbunge@gmail.com
11
Home > Products > Movable Partition Walls >

Customized Movable Partition Walls On Aluminum Track For Exhibition Halls

Browse Categories

Guangdong Bunge Building Material Industrial Co., Ltd

City: guangzhou

Province/State:guangdong

Country/Region:china

Tel:86-20-81718567

Contact Person:
Ms.Buffy
View Contact Details

Customized Movable Partition Walls On Aluminum Track For Exhibition Halls

Brand Name BUNGE
Model Number 65 SERIES
Place of Origin Guangdong , China
Minimum Order Quantity No MOQ
Price USD 80-90 Square meters
Payment Terms L/C, D/A, D/P, T/T, Western Union
Supply Ability 2000 Square meters per month
Delivery Time 15 workdays
Packaging Details Inside the paper, outside a non - log wood frame
General use soundproof partition walls are used for Interior decoration
Type folding partition
Material MDF
Color Customized
Size Customized
Thickness 65mm
Application Banquet hall
Style Modern
Product name folding partition wall
Height Max 4000 mm
Width 1200 mm
Finishing option Melamine,fabric
Detailed Product Description

OEM ODM Customized Style Popular Movable Partition Walls On Aluminum Track For Banquet Hall

 

Modernized Soundproof Movable partition
1.Hanging on ceilingThe floor without a track, just put the rail mounted on the ceiling
2.Excellent QualityEach pieces of partition can turn around 360 degree.
3.Stable and secureAfter partition is stable and reliable, and is not easy to swing
4.Energy efficientThe large space divided into a small space, in order to reduce air conditioning power consumption;
5.Heatproof&fireproofGood heat insulation performance, Adopt effective fire prevention materials
6.Elegant appearanceSurface any adornment, can unite with indoor adornment effect
7.Easy to collectCan be hidden in the special coffer, does not affect the overall appearance
8.Various applicationsHotels, exhibition halls, restaurants, multi-functional rooms etc.

 

 

Partition detail analysis

 

1: Anti-skid groove is added in the single-wheel track, so that the lifting wheel can still slide smoothly under the condition of side deviation

 

2: Double wheel bearing 300KG

 

3: Rail multi-angle bevel cutting surface, no cracking using German imports inch industrial grade aluminum cutting machine cutting.45 90 180

 

bevel section, seamless joint using low-frequency modulation pulse MIG welding technology, no cracking.

 

4: Imported bearing, high speed, stable and smooth

 

 

FAQ

 

1:What you should you do on site?

A beam (truss)should built on site for track installation.The minimum distance leaving for track installation from false ceiling to top ceiling is 180mm.

 

2:How to install?

We will provide the installation manual and video guiding the installation job.We can also dispatch the installation engineer supervising the installation as request.

 

3:What is lead time ?

The lead time is 7 days to 10days.

 

4:How to transport?

Sea transport is a common mode of transportation.In an emergency,can be air freight .

 

5:How do the goods packing?

Carton paper package ,MDF batten cover all around cotner.

 

6:What is procurement procedure?

Firstly, seng us the shop drawing (if the shop drawings is not available ,you can tell us the height from false ceiling to finfshed floor and width from wall to wall)

Secondly, we offer you the movable wall layout drawings for your confirmation.

Thirdly, we quote the movable wall in acordance with confirmed drawings.

 

 

Our services

 

Professional drawing design

 

Professional production and installation team

 

High quality materials and accessories

 

It offers a three-five year warranty

 

 

Cooperation steps

 

Step 1: send us an inquiry.

 

Step 2: send us detailed engineering drawings or dimensions.

 

Step 3: we offer solutions and quotes.

 

Step 4: negotiate and discuss details.

 

Step 5: place the order and arrange the deposit.

 

Step 6: make detailed construction drawings and review before production.

 

Step 7: determine the construction drawing and arrange production.

 

Step 8: quality control and inspection.(production pictures are provided for verification)

 

Step 9: arrange shipment after receiving the balance.

 

Step 10: provide installation drawings

 

Step 11: after sales service

 

 

 

 

Product Tags: movable partitions systems   acoustic movable walls  
Related Products
Email to this supplier
 
From:
Enter your Email please.
To: Guangdong Bunge Building Material Industrial Co., Ltd
Subject:
Message:
Characters Remaining: (80/3000)