Customized Movable Partition Walls On Aluminum Track For Exhibition Halls
|
OEM ODM Customized Style Popular Movable Partition Walls On Aluminum Track For Banquet Hall
Partition detail analysis
1: Anti-skid groove is added in the single-wheel track, so that the lifting wheel can still slide smoothly under the condition of side deviation
2: Double wheel bearing 300KG
3: Rail multi-angle bevel cutting surface, no cracking using German imports inch industrial grade aluminum cutting machine cutting.45 90 180
bevel section, seamless joint using low-frequency modulation pulse MIG welding technology, no cracking.
4: Imported bearing, high speed, stable and smooth
FAQ
1:What you should you do on site? A beam (truss)should built on site for track installation.The minimum distance leaving for track installation from false ceiling to top ceiling is 180mm.
2:How to install? We will provide the installation manual and video guiding the installation job.We can also dispatch the installation engineer supervising the installation as request.
3:What is lead time ? The lead time is 7 days to 10days.
4:How to transport? Sea transport is a common mode of transportation.In an emergency,can be air freight .
5:How do the goods packing? Carton paper package ,MDF batten cover all around cotner.
6:What is procurement procedure? Firstly, seng us the shop drawing (if the shop drawings is not available ,you can tell us the height from false ceiling to finfshed floor and width from wall to wall) Secondly, we offer you the movable wall layout drawings for your confirmation. Thirdly, we quote the movable wall in acordance with confirmed drawings.
Our services
Professional drawing design
Professional production and installation team
High quality materials and accessories
It offers a three-five year warranty
Cooperation steps
Step 1: send us an inquiry.
Step 2: send us detailed engineering drawings or dimensions.
Step 3: we offer solutions and quotes.
Step 4: negotiate and discuss details.
Step 5: place the order and arrange the deposit.
Step 6: make detailed construction drawings and review before production.
Step 7: determine the construction drawing and arrange production.
Step 8: quality control and inspection.(production pictures are provided for verification)
Step 9: arrange shipment after receiving the balance.
Step 10: provide installation drawings
Step 11: after sales service
|
||||||||||||||||||
Product Tags: movable partitions systems acoustic movable walls |
![]() |
Temporary Office Division Conference Room Folding Movable Partition Walls |
![]() |
Office Fireproof Acoustic Folding Door Removable Wall Partitions Philippines |
![]() |
Convention Hall Foldable Partitions Acoustic Movable Walls Thailand |
![]() |
Office Room Division Convention Center Acoustic Movable Partition Walls Kenya |
![]() |
Church Acoustic Foldable Partition Soundproof Movable Partition Walls |
![]() |
Soundproof Meeting Room Divider Folding Movable Office Partition Walls |