Custom Sound Proofing Movable Office Partition Walls 85 mm Width
|
Custom Sound Proofing Movable Office Partition Walls 85 mm Width
The details of movable partition walls
Custom movable partition walls are more suitable for hotel and
modern studio design than traditional hotel partition walls. The
customization of the activity partition in the hotel's decoration
has broken down the rigid screen of the fixed hotel partition wall.
There are many kinds of selections on the raw materials, which
provide us with reasonable planning and will not waste the use of
space. Hotel decoration selection activity hotel partition wall
advantages and features introduced. Features & Benefits of movable partition wallsMovable, top hung system without the need for a floor track The procedure of installing the movable partition walls
1. Observe the construction environment The survey of the construction environment is now a must. The main purpose of surveying the construction environment is to determine that the site does not have installation conditions, record the position of the beam column on the roof, and the location of the air-conditioning piping system to customize the final construction plan. The most suitable time for construction is before the venue has been renovated.
2. Measurement and positioning According to the construction drawing, the position control line of the movable partition is released on the indoor floor, and the position line of the partition wall is led to the side wall and the ceiling. The installation position line of the fastener should be ejected when playing. The installation height of the track must be negotiated with the construction team that installed the ceiling, otherwise it will cause great trouble.
3. Steel Structure and Rail Mounting The steel structure is a load-bearing structure that connects the roof with the track. The steel structure involves the safety of the entire active partition system, so it must not be taken lightly. According to the construction drawing, pull the screws on the roof, and then fix the angle iron. According to the design requirements, select the rail fixings. Before the installation of the track, consideration should be given to the practice of closing the wall, floor, and ceiling and to facilitate the installation of the movable partition. By calculating the weight of the movable partition, the load on the track and the specifications and fixing methods of the embedded parts are determined. The embedded parts of the track should be firmly installed, and the track and the main structure should be firmly fixed. All metal parts should be treated with rust prevention.
4. Installation track (1) Suspended track: The suspension guide is fixed by installing a
pulley on the top surface of the movable partition walls and
connecting it to the upper suspended track. Tracks and pulleys
should be chosen according to the weight of the load. Lightweight
mobile partition walls, with rails fastened to the top wood frame
or steel frame with wood screws or counter-screws. Heavy-duty
activity partitions, where the rails are fastened with screws or
welded to steel profiles. (2) Supported rails: The fixing method of the support guide is that
the pulley is at the lower part of the partition and forms the
lower support point with the ground track. The track is fixed with
a bulging pin or with a rail embedded part, and a guide rail is
installed along the top wooden frame. (3) When installing the track, according to the specific conditions of the track, install the pulley or track reserved opening in advance (usually on the side of the wall 1/2 partition fan)
5. Install the activity panel According to the installation method, accurately identify the pulley laying line on each panel, and then fix the pulley fixing bracket to the upper or lower jaw of the partition fan. Then, the panels are loaded into the rails one by one, and the panels are adjusted perpendicular to the ground, and the push-pull rotation is flexible. Finally, the fans are connected and fixed. The hinges are usually connected between adjacent panels.
6. Finishing Facing finish according to design requirements. General use of soft, cold solid wood panels, decorative panels, glass and other inserts. After the finishes are done, paint or finishing must be done. Finishing decoration construction shall be carried out according to the corresponding requirements of the second standard.
7. Commissioning After the movable partition walls panel is installed, it is necessary to debug the panel, sealing and other details, clear the site after commissioning, and complete the installation work.
|
||||||||||||||||||||||||||||||||||||||||
Product Tags: movable walls on wheels movable partitions systems |
![]() |
Temporary Office Division Conference Room Folding Movable Partition Walls |
![]() |
Office Fireproof Acoustic Folding Door Removable Wall Partitions Philippines |
![]() |
Convention Hall Foldable Partitions Acoustic Movable Walls Thailand |
![]() |
Office Room Division Convention Center Acoustic Movable Partition Walls Kenya |
![]() |
Church Acoustic Foldable Partition Soundproof Movable Partition Walls |
![]() |
Soundproof Meeting Room Divider Folding Movable Office Partition Walls |