China Building Steel Frame manufacturer
Hongfa Steel Structure Mats. Co., Ltd.
Pay Attenion Please : Raw Materail cost is going up again, please make some inquiry before you placing the orders.
10
Home > Products > Warehouse Steel Structure >

Hot-dip Galvanized Prefabricated Warehouse Steel Structure Building

Browse Categories

Hongfa Steel Structure Mats. Co., Ltd.

City: dongguan

Province/State:guangdong

Country/Region:china

Tel:86-769-86768228

Contact Person:
Ms.Anna Ye
View Contact Details

Hot-dip Galvanized Prefabricated Warehouse Steel Structure Building

Brand Name HongFa
Model Number H beam, C or Z sections purlins
Certification ISO SGS
Place of Origin DONGGUAN, GUANGDONG, CHINA
Minimum Order Quantity 50 tons
Price Negotiable
Payment Terms L/C, D/A, D/P, T/T, Western Union, MoneyGram
Supply Ability 10000 metric ton/month
Delivery Time 15~45days
Packaging Details Packed in a iron holder and then by a container, normally 15tons ~25tons per 40HQ container, loading quantity according to member's shape and length
Grade Q235B; Q345B
Purlin C-section and Z-section
Surface Painted or hot-dip galvanized
Dimensions Customers' requirement
Wall and roor panel Rock wool /PU/ EPS sandwich/color sheet
Door Sliding or rolling door
Detailed Product Description

Hot-dip Galvanized Prefabricated Steel Structure Building For Warehouse

 

 

1. General Descriptionc


Garage Steel Frame /Steel Structure Rooms use pre-fabricated  steel H  beams to build the main steel frames and use  galvanized C & Z beams as the roof and wall purlin, cladding systerm can do the glass curtain wall , or aluminum curtain wall or use colored steel wall and roof , or can use FRP light tiles.
Quick to fabricate,Easy to assemble,
Long using time over 50 years,
Low cost and maintenance,
Environment friendly,
Recyclable,
Lighter weight,
Excellent anti-shock and anti-impact ability.
 
2. Material Specification Datas for reference
 

 

 
3. Process method
 
CNC Steel plate cutting---- H Shape Forming ------ Welding By ARC Soldering Machine---- Straight/ Shape Fixing --- Joint Steel plate weld by manual--- Sand-blasting---- Paint Treatment Step----Loading Packing
 
4.Loading & Installation for reference
 
Loaidng in factory

 
 
Loading at the project site



 
 
Installation at job site
 

 
 

 

5. Before sales service
 
We have professional engineer teams to make the structural drawing and building drawing according to customer's requirements.
If you are planing to build a Garage Steel Frame Building, please send your requirements to me, and then we can give you the best solution.
 

BUILDING  INFORMATION FORM
We will give you professional technical solution if you can fill this for and contact with us by e-mail, fax or tel which listed at the bottom of this form.
Compay Name:
Client Tel/Fax: E-mail: 
Building Basic Information
Project: Project No.: 
Location Building Usage  Total area 
Length
(m)
 Width
 (m)
 Eave Height
(m)
 
Roof material 
Wall material 
Design Load and Meteorological Conditions
Wind load
(kn/m2)
 Wind speed
(m/sec)
 Snow load
(kn/m2)
 
Rainfall
Capacity
 Earthquake Grade 
Please fill out the below information if your building has the mezzanine
Height of Mezzanine(m) Usage of mezzanine 
Live load on mezzanine(kn/m2) 
Please fill out the below information if your building has the crane
Capacity
(t)
 Span
(m)
 Quantity 
Hoisting height (m) Other information about crane 
Building sketch       

 
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

6. After- Sales
 
We can offer you the whole set installation drawings for assembly conduction.
 
Also we have professional installation teams, if you need , we can offer the installation engineers to help you to conduct the whole buildings installation.
 

Product Tags: steel building warehouse   steel house frames  
Related Products
Email to this supplier
 
From:
Enter your Email please.
To: Hongfa Steel Structure Mats. Co., Ltd.
Subject:
Message:
Characters Remaining: (80/3000)