China Cold Roll Forming Machine manufacturer
Jiangyin Dingbo Technology Co., Ltd
Jiangyin Dingbo Technology Co.Ltd. Professional in manufacturing roll forming machine
11
Home > Products > Shutter Door Roll Forming Machine >

Shutter Cold Roll Forming Machine / Door Frame Roll Forming Machine

Shutter Cold Roll Forming Machine / Door Frame Roll Forming Machine

Brand Name Shenghong
Model Number SH16-06-05-06
Certification ISO9001 and CE
Place of Origin China, Jiangsu
Minimum Order Quantity 1 sets
Price Negotiation
Payment Terms T/T
Supply Ability 30 SETS/ MONTH
Delivery Time 40 days after payment
Packaging Details Container
Material of rollers 45# steel
Production Capacity 8-12m/min
Power(W) 7.5KW
Roller Material GCr15
Cutting Power 5.5kw
Detailed Product Description
 
Shutter Cold Roll Forming Machine / Door Frame Roll Forming Machine
 
Product Description

 

 

Drawing for you reference:

 

Parameters:

ROLL FORMING SYSTEM

Suitable materialSteel with 1.2-1.5mm
Main roller station18 groups
Straighting rollers5 groups
Motor power7.5KW
Reduce type250#
Shaft diameterΦ70mm
Shaft material45# forging Steel
Roller materialGCr15
Roller treatmentVacuum hardening & Polished
Galvanization0.05mm
Processing speed8-12m/min
Chain size

1.2inch

 

 

PLC CONTROL SYSTEM

PLC BrandSIEMENS
Frequency ChangerSANJING
Electrical elementSchneider
Touch screenTouch-win
Fuse protectorSchneider
Control transformerSchneider
Voltage standard380V50Hz
 

 

HYDRAULIC SYSTEM

Hydraulic Pump Station1 SET
Pump Motor Power5.5KW
Cutting mold materialCr12
Length Cutting Tolerance+/-1.5mm

 

After-sale Serive

The seller take responsibility to installation and commissioning of the equipment and free training. After machine arrive the destination, by the request of the buyer , the seller will provide 1 technical engineer to guide installation and training , and the buyer should give the technical person with full cooperated.
Installation period: about 5 days after the complete preparation by the buyer such as the foundation and all necessary accessories.
Training time: 5 days.
Before departure of the engineers from seller, the buyer should pay for installation and commissioning fee 100$/day to the point account of the seller. The two-way ticket,visa, food, hotel , the translator and insurance are all should provide by buyer with full responsibility.
The seller supply technical data (including forming mould drawing, electrical elements drawing and equipment drawing etc.)

Product Tags: door frames roll forming machine   frame making equipment  
Related Products
Email to this supplier
 
From:
Enter your Email please.
To: Jiangyin Dingbo Technology Co., Ltd
Subject:
Message:
Characters Remaining: (80/3000)