Mineral insulated k/ J type thermocouples temperature probe for hot
runner system
Description:
1) The appearances of sheath thermocouples are greatly differential
due to their different use requirements. But their basic structures
are roughly the same. They are usually composed to the main
components such as armoured thermocouple elements, mounted fixing
devices, connection boxes and so on .
2) Sheath thermocouple element: it is a solid substance combined by
metal sleeves, insulants (commonly the magnesia powder) and
thermocouple wires. According to the structural form of the
measured terminal, It may be divided into unground type , ground
type, terminal exposed type , separable unground type for
consumers’ choice. If not defined by the consumers , we may offer
the unground type.
3) The connection methods: its structure may be divided into
porcelain patch board, easy type, co-external diam. Protection cap
type, anti-splash connecting box type, water-proof terminal block
type, explosion isolation junction block type, socket type, spring-
load type, handle type, with compensation conductor type etc.
Specification:
1.mineral insulated cable material :310SS
2.mineral insulated cable size: Dia 3*Length 250mm
3.wire:1m metal wire
4.probe feather:flexible / insulated can up to 1100C
5.accuracy:1.5% or 0.4%t
6.certification:ISO9001/CE
Thermocouple catelory | Product model | Graduation mark | Thermometric scope | Protection tubings | Specification Total length |
Single Nickel chromium Nisiloy | WRKK-_01 WRKK-_91 | Ungroud | K | 0~800°C 0~1100°C | 304 321 310S GH3030 INCONEL600 | Slef-determined by customers |
WRKK-_02 WRKK-_92 | Ground |
Double Nickel chromium Nisiloy | WEKK2-_01 WEKK2-_91 | Ungroud |
WEKK2-_02 WEKK2-_92 | Ground |
Application:
This series assembly thermocouple can be used for
the temperature measuring and control in the erumpent processing of
chemical fiber,
rubber plastic,
food industry,
boiler and other industries.
Payment Terms and Shipping:
1.Loading Port: Shanghai China
2. Samples Leading Time: 3-7 working days
3. Delivery Time: Within 7-15 days after payment
4.Payment: T/T, Western Union, Paypal