Casing Pipe Rotators , Hydraulic Casing Rotators
|
|
Casing Rotator KTR3205H
1. Description
About Hydraulic Power Station
We have the convenient operating system, according to the working condition the operating system platform of micro computer can keep the machine at an optimum working state by adjusting the speed, torque and pressing force, and promote the work efficiency to the maximum.
Use for different types construction:
(1) Foundation pile, continuous wall Foundation piles for high-speed rail, road and bridge and house building; Articulation pile constructions which are required to be excavated, such as subway platforms, underground architectures, continuous walls. Water retaining wall of reservoir reinforcement.
(2)Drilling gravels, boulders and karst caves It is allowable to conduct the foundation pile construction at mountain lands with gravel and boulder formations. It is allowable to conduct operation and cast the foundation piles at the thick quicksand formation and necking down stratum or the filling layer. Conduct rock-socketed drilling to the rock stratum, cast the foundation pile.
(3) Clear the underground obstructions During the urban construction and bridge rebuilding, the obstructions such as the steel reinforced concrete pile, steel pipe pile, H steel pile, pc pile and wood pile can be cleared directly, and cast the foundation pile on the spot.
(4) Cut the rock stratum Conduct the rock-socketed drilling to the cast-in-place piles. Drill through-holes on the rock bed(shafts and ventilation holes).
(5) Deep excavation Conduct the in-place casting or steel pipe pile inserting for the deep foundation improvement. Excavate deep wells for construction use in the constructions of reservoir and tunnel.
2. Specifications
3.Competitive Advantage
(1) No noise, no vibration, and high safety.
(2) Without mud, clean working surface, good environmental friendliness, avoiding the possibility for mud to enter the concrete, high pile quality, enhancing the bond stress of concrete to the steel bar;
(3) During construction drilling, the characteristics of stratum and rock can be directly distinguished;
(4) The drilling speed is fast and reaches about 14m/h for the general soil layer;
(5) The drilling depth is large and reaches about 80m according to the situation of soil layer;
(6) The hole forming verticality is easy to master, which can be accurate to 1/500;
(7) No hole collapse will be caused, and the hole forming quality is high;
(8) The hole forming diameter is standard, with little filling factor. Being compared with other hole forming methods, it can save a lot of concrete usage;
(9) The hole clearing is thorough and fast. The drilling mud at the hole bottom can be clear to about 3.0cm.
Company InformationFAQ
|
||||||||||||||||||||||||||||
| Product Tags: TYSIM Casing rotator Casing Rotator System Hydraulic Casing Rotators | ||||||||||||||||||||||||||||
|
Used Piling Rig Machine with 20t Machine Weight, Closed Loop Hydraulic System, and Up To 30 Meters Max Pile Length |
|
Used Piling Rig Machine with 66 Kpa Ground Pressure, 30 Meters Pile Length, and Closed Loop Hydraulic System for Foundation Construction |
|
Used Piling Rig Machine with Max Pile Length Up To 30 Meters 380 V and Stick Length 2800 Mm for Foundation Piling |
|
Used Piling Rig Machine with 30 Meters Max Pile Length, ISUZU AA-6HK1XQP Engine, and 66 Kpa Ground Pressure for Heavy Duty Construction |
|
Used Piling Rig Machine with Closed Loop Hydraulic System, Rated Speed 3.1 or 5.2 Kmh, and 20t Machine Weight for Precise Piling |
|
Used Piling Rig with ISUZU AA-6HK1XQP Engine Featuring Closed Loop Hydraulic System for Max Pile Length 30 Meters |